Language selection

Search


Fact sheets: Standing Committee on Citizenship and Immigration: 2026 Auditor General Report on International Students Program Reforms (April 20, 2026)

CBSA stats and facts

2025 Stats and Figures January 1 to

Budget – A and B base (source of info: 2026–2027 Main Estimates)

2025 to 2027 CBSA budget (in millions $)
(in millions $) 2025–2026 CBSA budget 2026–2027 CBSA budget
A-Base (Ongoing) funding 1,983 1,951.6
B-Base (Temporary) funding 729 779.9
Statutory (Employee Benefit Plan) 281 338.4
Total budget 2,993 3,069.9

FTEs – uniformed, operational and support

Approximately 17,000 employees
over 8,500 front line
1,200 ports of entry and in 36 countries.

Ports of entry – air, land, marine

  • 117 land-border crossings – 61 on a 24/7 basis
  • 13 international airports – 10 on a 24/7 basis
  • 27 rail sites
  • 3 Major Ports (Halifax, Montréal and Vancouver) numerous marinas and reporting stations

IT Contracts – number and amount and decrease over past years (source of info: Q1 report to TBS)

36 IT consultants as of , compared to 250 in .

The reduction in consultants reflects the CBSA's steady decline in overall contract use. The amount of active contracts has reduced by 55% between and from 2275 to 1027.

Executives

  • 44% of VPs/RDGs have served on the frontline (8 out of 18)
  • 35.7% of the Executive cadre (at all levels) worked on the frontline directly supporting the CBSA mandate at some point in their career (91 out of 255)
  • 48.2% of the Executive cadre (at all levels) have either worked directly on the frontline and/or occupied a role that required supervision of frontline employees (123 out of 255)
  • 66% of VPs and RDGs are women (12 out of 18)

Travellers in 2025 (to )

  • 82,300,378 travellers:
    • Air: 36,678,160
    • Highway: 42,019,470
      • including 5,536,892 truck drivers
    • Marine: 3,357,015
    • Rail: 245,701
  • 34,227,852 travellers used Primary inspection kiosks
  • 4,115,070 travellers used Advanced Declaration
  • 17 additional primary inspection kiosks across Canada
  • 2.1 million NEXUS members

Commercial goods imports in 2025 (to )

  • 30.7 million releases of goods into the commerce of Canada
  • 149 million courier shipments
  • $265.8 billion Trusted Trader value for duty imported
  • $47.5 billion total duties and taxes assessed (customs duties, Special Import Measures Act [SIMA] duties, surtaxes, GST and excise taxes)
  • Commercial by the numbers:
    • Highway: 5,038,595 trucks
    • Air: 3,817,803 shipments
    • Marine: 2,012,946 containers
    • Rail: 1,815,786 cars

Food, plant and animal 2025 (to )

A total of 3,668 Agriculture and Agri-Food Administrative Monetary Penalties (AAAMP) issued for food, plant and animal import violations totaling $2,830,200 in penalties.

Enforcement in 2025 (to )

A total of 52,238 seizures, coming in to Canada (from US and other countries), including:

  • 659 seizures for a total of 833 firearms seized
  • 8,263 seizures for a total of 17,771 weapons seized
  • 31,688 illegal drugs seizures
    • Cocaine (including coca leaves, coca paste, cocaine and cocaine crack): 4,725 kilograms
    • Heroin: 128 kilograms
    • Fentanyl: 2.8 kilograms
    • Methamphetamines: 2,397 kilograms
    • Other opioids (including opium, methadone, morphine and morphine base): 1,144 kilograms
    • Other drugs, narcotics and chemicals: 28,206 kilograms (this number excludes cocaine, heroin, fentanyl, methamphetamine, other opioids and cannabis)
  • 16,029 cannabis seizures totaling 46,608 kilograms
  • 3,457 tobacco seizures totaling 803,652 kilograms
  • 99 child pornography seizures

Firearm seizures in 2025 (to )

  • Total firearms seized: 833
  • Total firearms seizures: 659
Firearm seizures by types
Firearm type Quantity
Miscellaneous (for example, replica firearms, firearms parts, large capacity magazines, silencers, etc.) 30,317
Handgun 499
Semiauto pistol 115
Revolver 71
Rifle 60
Full auto carbine 8
Shotgun 31
Other (including full auto pistol, full auto rifle and semiauto carbine) 16
Semiautomatic rifle 29
Antique firearm 4

Weapons seizures in 2025 (to )

  • Total weapons seized: 17,771
  • Total weapon seizures: 8,263
Weapons seizures by types
Prohibited weapons type Quantity
Brass Knuckle 2,617
Automatic opening knife 4,755
Centrifugal opening knife 5,914
Stun Gun 2,361
Kiyoga/steel cobra baton 392
Tear Gas/pepper spray 637
Innocuous device with knife 176
Bladed Ring 35
Taser 429
Push dagger 208
Gravity opening knife 109
Crossbow (one handed use) 7
Shuriken 45
Nunchaku 17
Other (including Constant Companion kife, Kusari/Manrikigusari) 52
Morning Star 15
Blowgun 2

Breakdown of LO-Intervened off-boards (to )

# of Clients Intercepted / Offloaded by the International Network
Year Suspected Fraud Technical Total
2021 2,647 16,608 19,255
2022 6,587 2,162 8,749
2023 7,496 1,239 8,735
2024 9,920 1,132 11,052
2025 - - 7,037
Total - - -

Alternatives to Detention (ATDs) Statistics

Overview of Current ATD Participants as of
Province ATD Client Count
Newfoundland and Labrador 20
Nova Scotia 70
Prince Edward Island 0
New Brunswick 42
Québec 1,868
Ontario 8,816
Manitoba 491
Saskatchewan 91
Alberta 1,469
British Columbia 2,317
Nunavut 0
North West Territories 0
Yukon 0
Total 15,187

Allowed to Leaves issued at POEs

2023 2024 2025
Number of Allowed to Leaves issued at POE 37,304 44,948 40,693
  • If an officer at a port of entry examines a foreign national and the person is believed to be inadmissible, the officer may in some circumstances allow the person to voluntarily withdraw their application to enter Canada and allow them to depart
  • Each case will be assessed individually and a decision will be based on the specific facts of the case and whether the objectives of the IRPA would be best achieved without seeking a formal removal order

Inadmissibility (A44) Reports (serious inadmissibility grounds)

2023 2024 2025
A44 reports – serious inadmissibility grounds 3,590 4,354 1,010
  • The above represents A44 reports for the following IRPA inadmissibility grounds: security, human rights violations, serious criminality, criminality, organized crime, sanctions and transborder criminality
  • A finding of inadmissibility begins with the officer making an allegation by preparing an inadmissibility (A44) report which is supported by evidence
  • A44 is then reviewed by another official (Minister's Delegate) who may issue a prescribed removal order if the inadmissibility allegation is within their jurisdiction or refer the A44 report to the Immigration and Refugee Board for an admissibility hearing

Stolen vehicles

Region 2018 2019 2020 2021 2022 2023 2024 2025
Atlantic (ATL) 73 30 100 118 51 188 142 192
Quebec (QUE) 348 605 816 1,020 1,050 1,204 1,313 972
Northern Ontario (NOR) 0 0 1 2 3 0 0 0
Southern Ontario (SOR) 4 5 2 0 9 0 0 0
Greater Toronto Area (GTA) 25 69 250 194 229 773 680 211
Prairies 2 2 0 1 0 0 6 10
Pacific 11 55 75 10 6 0 136 205
Total 463 766 1,244 1,345 1,348 1,806 2,277 1,590

Anti-dumping (As of )

As of , the CBSA has conducted 33 anti-dumping and countervailing investigations across nine product groups, spanning the mineral oil, paper, plastic, and predominantly steel industries, involving 15 countries, primarily China. Of the 33 investigations, 24 are ongoing.

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
# of products 4 6 6 1 7 4 2 1 5 9
# of investigations handled 16 18 18 6 28 7 4 2 12 33

Active Investigations:

  1. Thermoformed Molded Fibre Tableware
    • Plates, bowls, and take-out containers made from recycled paper pulp. They're pressed into shape (molded) and often used as eco-friendly disposable tableware
  2. Oil Country Tubular Goods
    • Steel pipes used in the oil and gas industry to drill wells and bring resources to the surface. This includes casing, tubing, and drill pipe that must withstand extreme underground pressure
  3. Cast Iron Soil Pipe
    • Heavy, durable iron pipes used to carry waste and water in buildings and underground systems. They're common in older plumbing and commercial construction because they reduce noise and last a long time
  4. Thermal Paper Rolls
    • Paper used in cash register receipts and credit card machines that darkens when heated by the printer head
  5. Steel Strapping
    • Strong, flat steel bands used to bundle and secure heavy products—like lumber, steel coils, or bricks—during shipping or storage
  6. Carbon and Alloy Steel Wire
    • Long, thin strands of steel made by drawing carbon or alloy steel through dies. Used for making nails, fencing, springs, cables, and many industrial products
  7. Polyethylene Terephthalate Resin
    • A type of plastic resin used to make clear beverage bottles, food containers, and synthetic fibres like polyester clothing. It's lightweight and recyclable
  8. Renewable Diesel
    • A fuel made from animal fats, vegetable oils, or other organic materials. It's chemically similar to regular diesel and can be used in diesel engines without blending, but it produces fewer greenhouse gas emissions
  9. Truck Bodies
    • Rigid structures mounted onto truck chassis that are designed to contain or support goods during on-road transportation. These include box-type truck bodies (insulated or non-insulated), refrigerated bodies, and truck body kits or assemblies

Enforcement statistics

Drugs

Key Takeaways (Overall Quantities in grams)

  • The 2025 seizure total (83,210,800g) exceeds the total reported for all of 2024 (52,056,505g). This represents a 60% increase
  • Compared with 2023 (79,352,888g), seizure numbers in 2024 (52,056,505g) were lower, reflecting a downward trend. This is a decrease of about 34%
  • 2020 recorded the lowest amount of seizures (30,150,272g). This is likely due to low traveller volumes during the COVID-19 Pandemic
  • In 2022, 55,618,092g of seizures were recorded. This then surged to 79,352,888g seized in 2023. This represents approximately a 43% increase

Key Takeaways (Overall - Count of Seizure Actions)

  • 2023 recorded the highest amount of seizure actions (39,057)
  • Seizure activity decreased in 2024 (28,339), compared to the 2023 count (39,057). This is a decrease of about 27%
  • 2024 recoded 28,339 seizure actions. This number then increased to 31,680 in 2025, representing a 12% increase

The most drug seizures were made in X Region, the least in X Region

  • From to . GTAR recorded the highest amount of drug seizures (154,752,088g)
  • From to , NOR recorded the least amount of seizures (744,502g)

Specific commodities where import seizures are up are/Specific commodities where import seizures are down:

Commodity Seized 2020 2021 2022 2023 2024 2025
Cannabis 3,617,026.28 4,676,476.16 2,523,144.54 10,400,202.15 4,750,460.97 3,765,572.20
Cocaine 1,175,871.06 1,159,075.53 3,094,102.76 1,752,739.21 4,542,856.67 4,309,886.22
Methamphetamine 616,046.26 374,698.22 584,328.01 2,189,346.68 1,200,771.25 1,258,946.57
Other Opioids 693,362.30 1,206,745.73 5,942,460.63 2,784,245.61 348,704.09 1,140,432.52
Fentanyl 2,421.00 2,815.63 1,410.95 616.38 661.33 314.25
Heroin 91,291.62 131,200.65 387,172.86 87,524.96 3,044.29 123,669.98
All Other Drugs 20,526,320.05 20,615,576.09 30,089,838.98 40,543,191.82 26,837,717.86 27,183,862.29
All quantities are in grams
2025 data is from January 1 to December 31

Specific commodities where export seizures are up/ Specific commodities where export seizures are down:

Commodity Seized 2020 2021 2022 2023 2024 2025
Cannabis 3,101,582.16 7,610,512.65 11,147,571.68 13,200,661.79 13,032,517.11 42,835,410.14
Cocaine 12,190.16 155,995.17 40,689.29 34,946.04 46,100.86 389,368.80
Methamphetamine 170,745.97 511,377.42 1,156,453.48 7,939,500.06 971,741.15 1,138,479.11
Other Opioids 29.51 119.00 245,994.29 3,563.54 899.88 3,649.15
Fentanyl 4,475.10 87.28 2,471.27 43.24 4,269.60 2,456.15
Heroin 530.40 359.10 10,642.20 98.40 34,955.53 4,469.19
All Other Drugs 138,377.86 94,783.18 391,811.73 416,208.22 281,804.56 1,002,866.03
All quantities are in grams
2025 data is from January 1 to December 31

The five year trend for drug seizures is:

Overall Import vs. Export Seizures (g)
2020 2021 2022 2023 2024 2025
Import 26,722,338.48 28,166,592.61 42,624,458.75 57,757,835.11 37,684,209.42 37,782,844.59
Export 3,427,934.48 8,373,229.20 12,993,633.92 21,595,052.99 14,372,295.73 45,376,538.02
Count of Seizure Actions - Import vs. Export
2020 2021 2022 2023 2024 2025
Import 32,633 27,269 21,533 42,063 25,808 23,781
Export 2,692 6,498 9,708 7,201 6,621 7,899
Commodity Seized 2020 2021 2022 2023 2024 2025
1,4-butanediol (BDO) 0.00 0.00 83,152.00 9,920,101.00 183,670.00 390,748.10
1-Phenyl-2-propanone 0.00 0.00 31,570.00 36,678.00 4,568,300.00 27,158.00
3,4-Methylenedioxyphenyl-2-pro 0.00 0.00 5,983,371.25 6,075,213.80 326,709.80 2,442.00
Ephedrine 3,159.30 8,173.78 177,040.71 54,821.67 31,997.25 186,695.16
Ergotamine 175.73 110.00 95.01 115.16 248.24 20.05
Gamma butyrolactone (GBL) 0.00 0.00 1,351,494.00 263,579.00 53,236.00 1,056,430.00
Lysergic Acid 3.00 112.00 37.01 8.00 32.02 9.55
N-Acetylanthranilic Acid 1,284.00 0.00 0.00 0.00 0.00 0.00
Norephedrine 0.00 0.00 80.00 0.00 0.00 0.00
Phenylacetic Acid 0.00 0.00 0.00 0.00 0.00 12,800.00
Piperidine 603.70 0.10 351,354.00 67,060.30 1,000.00 28.00
Potassium Permanganate 0.00 3.00 1,220.00 928.00 0.00 2,396.20
Pseudoephedrine 57.30 184.70 74.00 1,409.00 856.30 2,077.30
White phosphorus 0.00 0.00 0.00 0.00 10.00 3,280.00
Hypophosphorous acid 0.00 0.00 0.00 0.00 0.00 1,570.00
Grand Total 5,283.03 8,583.58 7,979,487.98 16,419,913.93 5,166,059.61 1,685,654.36
Note: 2025 data only goes up to
The above table shows the quantity of precursor chemicals seized in grams only

The five year trend for precursor seizures is:

Precursors - Import vs. Export (g)
2020 2021 2022 2023 2024 2025
Import 4,584.43 7,207.48 7,951,586.57 16,375,852.93 5,138,477.68 1,638,936.72
Export 698.6 1,376.1 27,901.41 44,061 27,581.93 46,717.64

Firearms

Commodity Type 2020 2021 2022 2023 2024 2025
Firearms 495 1,071 1,100 920 883 833
Weapons 52,230 63,571 20,906 27,134 17,260 17,771
to
Firearms Seizures
2020 2021 2022 2023 2024 2025
Firearms 495 1,071 1,100 920 883 833
Weapon Seizures
2020 2021 2022 2023 2024 2025
Weapon 52,230 63,571 20,906 27,134 17,260 17,735

CBSA Criminal Investigation Prosecution Outcomes:

2021 2022 2023 2024 2025
Firearms cases with findings of guilt 18 18 38 29 42
Firearms and prohibited weapons cases with findings of guilt 21 24 47 37 49

Charge/Prosecution Acceptance Rate:

From to , over 95% of the charge recommendations made by the CSBA to the Crown following firearms and weapons investigations undertaken by the CBSA, have resulted in charges approved.

Results of CBSA search warrants away from the border (as part of criminal investigations):

Items seized during CBSA search warrants
Prohibited Firearms Firearms Restricted/Non Restricted Prohibited Firearms Parts Firearms Parts Prohibited Weapons Prohibited Devices
to 95 225 102 275 3,020 152

Note: Not all firearms seized away from the border are associated to allegations of smuggling or other border offences. Some may be seized for other "plain view" offences, such as unsafe storage, when investigators are lawfully present pursuant to a CBSA search warrant.

Search warrant data is collated manually on a quarterly basis.

Stolen vehicles

Stolen vehicle trend

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
351 346 463 766 1,244 1,345 1,348 1,806 2,277 1,590

Undeclared currency

Currency and Suspected Proceeds of Crime Seizures

Total value of currency and suspected of proceeds of crime seizures from to

Commodity Seized 2020 2021 2022 2023 2024 2025
Currency 11,526,423 13,291,159 14,608,802 25,098,868 33,615,096 38,578,579
Suspected Proceeds of Crime 3,273,025 2,557,668 1,427,023 3,622,294 5,474,724 3,857,578
Currency Seizures
2020 2021 2022 2023 2024 2025
Currency 11,526,423 13,291,159 14,608,802 25,098,868 33,615,096 38,578,579
Suspected Proceeds of Crime Seizures
2020 2021 2022 2023 2024 2025
Suspected Proceeds of Crime 3,273,025 2,557,668 1,427,023 3,622,294 5,474,724 3,857,578

Asylum Statistics

Number of recommended offboards by CBSA ILOs

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2832Footnote 1 10,756 12,018 13,154 16,592 19,255 8,749 8,735 11,052 7,037

The number of asylum claims in the last 10 years are:

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
CBSA 11,342 22,208 29,545 29,486 7,950 13,052 64,551 72,809 59,401 34,015 344,359
IRCC 12,537 28,666 25,615 34,668 15,790 12,060 27,655 71,349 113,560 80,518 422,418
Total 23,879 50,874 55,160 64,154 23,740 25,112 92,206 144,158 172,961 114,533 766,777

Percentage increase 2016–2025: The percentage difference for both agencies combined between 2016 and 2025 is an increase of 380%)

Percentage increase 2022–2025: The percentage difference for both agencies combined between 2022 and 2025 is an increase of 24%)

The number of asylum claims at Lacolle are:

2023 2024 2025
20,415 8,158 15,369

Number of IRB asylum hearings with CBSA representation

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2,995 2,938 3,137 3,973 5,099 3,819 4,286 5,057 6,347 6,812

CBSA's annual removals:

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
7,636 8,746 8,385 11,271 12,851 7,513 8,328 15,220 17,382 22,576

CBSA's removal inventory (defined as removals in progress and wanted) is:

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
n/a n/a n/a 51,772 50,918 48,427 48,352 50,420 60,117 63,857

Projected removal inventory (including wanted and in progress) assuming at least 25,000 removals per year

2026 2027 2028 2029 2030
67,610 68,458 69,756 71,054 72,352

Assumptions:

  1. IRB maintains calendar year 2024 decision volume (approximately 73,000 decisions) and acceptance rate (63%). Although the new Asylum target for RPD is 80,000 to 85,000
  2. The CBSA enforces 25,000 removals per year (Note that the CBSA is currently funded for 20,000 in fiscal year 2026–2027, and 16,000 for future years)
  3. Impact of other inadmissibility cases (for example, overstays) is not included
  4. The CBSA will enforce 20,000 removals in 2025
  5. Bill C-12 impact on inventory is not included

Current top 5 recalcitrant countries:

Country Number of pending removals
India 6,557
China 1,433
Nigeria 1,028
Pakistan 908
Bangladesh 626

CBSA's security screening inventory vs completed screens per year:

Intake:

Year IRCC Asylum claims received Number of Asylum claims referred for security screening IRCC visa applications (TR/PR) received Number of visa applications (TR/PR) referred for security screening Total number of files received by IRCC Total number of files referred to for security screening Number of recommendations completed by CINSS (Files Closed) Remaining Security Screening Inventory at the end of the calendar year
2023 143,310 132,204 (92.3%) 6,898,855 73,780 (1.1%) 7,042,165 205,984 (2.9%) 129,896 102,268
2024 171,835 152,934 (89.0%) 6,614,190 71,200 (1.1%) 6,786,025 224,134 (3.3%) 161,737 155,017
2025 105,705 92,197 (87.2%) 4,454,540 42,286 (0.9%) 4,560,245 134,483 (2.9%) 96,046 185,656

data up until

Results:

Year Visa Applications (TR/PR) Asylum Claims Total
Non-favourable Favourable + Inconclusive + Non-favourable Favourable + Inconclusive + Non-favourable Favourable + Inconclusive +
2023 802 (2.1%) 33,860 (89.0%) 2,071 (5.4%) 127 (0.1%) 81,988 (89.3%) 4,262 (4.6%) 929 (0.7%) 115,848 (89.2%) 6,333 (4.9%)
2024 920 (2.2%) 36,103 (86.8%) 1,174 (2.8%) 152 (0.1%) 115,678 (96.3%) 952 (0.8%) 1,072 (0.7%) 151,781 (93.8%) 2,126 (1.3%)
2025 613 (2.6%) 19,963 (83.5%) 1,220 (5.1%) 147 (0.2%) 69,791 (96.7%) 340 (0.5%) 760 (0.8%) 89,754 (92.4%) 1,560 (1.6%)

data up until

CBSA's Detention Capacity is:

BC IHC Toronto IHC Laval IHC Ste. Anne Des Pleines Total
75 (max is 100) 157 (max is 207) 112 (max is 137) 25 (max is 25) 369 (max is 469)

Note: The maximum capacity includes the number of regular beds and the number of temporary cots.

CBSA's detention rates:

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5,969 8,540 8,489 9,193 3,104 2,475 4,902 5,191 4,276 3,604

CBSA's detention rate as a percentage of asylum claims

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
45% 32% 30% 33% 40% 40% 38% 47% 53% 52%

Notes:

  • Asylum claimants captured in this section include cases where the individual has already received a negative decision. The CBSA does not detain asylum seekers simply because they make a claim

Trade Statistics

Anti dumping and subsidy investigations – opened and concluded

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
# of products 4 6 6 1 7 4 2 1 5 9
# of investigations handled 16 18 18 6 28 7 4 2 12 33

As of

Sanctions Implementation – number of sanctions in place being enforced by CBSA

There are currently 12 countries against which there are import sanctions and 22 countries against which there are export sanctions. In recent years, the Government of Canada has increased its use of sanctions, currently imposing sanctions on 355 Harmonized System (HS) codes, as well as all goods being imported from North Korea and Syria. The CBSA's responsibility for exports is broader and requires ensuring compliance for all exports to North Korea, a wide range of industrial goods to Iran, and all exports to specific entities (people and businesses) in 19 other countries (for example, Myanmar, Sudan, Iraq). The current sanctions against Russia are the most extensive with 935 different HS codes covering industrial and luxury goods.

Duties and Taxes Compliance Statistics

Duties and taxes collected

2016 2017 2018 2019 2020
30,328,382,095.11 31,936,176,632.49 34,854,643,704.04 33,425,365,815.31 28,182,435,842.93
2021 2022 2023 2024 2025
33,290,518,168.28 39,352,361,078.33 39,757,683,389.86 39,553,010,699.70 47,500,000,000

Up to

Number of Compliance Verification Audits Concluded and Amounts Assessed

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
n/a n/a 1,203 1,386 651 989 833 814 815 598
n/a n/a $395.2 million $153.8 million $36.5 million $442.0 million $286.4 million $98.9 million $73.2 million $129.9 million

Up to

Additional Information:

Number of Compliance Interventions and Amount Assessed:

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
n/a n/a n/a n/a n/a n/a n/a 98 276 409
n/a n/a n/a n/a n/a n/a n/a $61.3 million $9.99 million $71.8 million

Up to

Strategic Export Enforcement - Sanctions and Counter-Proliferation Referrals for Enforcement by Counter-Proliferation Operations Section (CPOS), CBSA

  2016–2017 2020–2021 2021–2022 2022–2023 2023–2024 2024–2025 2025–2026 YTD
Total Export Declarations reviewed by CPOS 1,069,891 1,239,346 1,259,576 1,608,857 1,573,312 1,227,237 781,001
Sanctions-related Export Referrals to Regions 10 4 12 59 76 145 106
Non-Sanctions Export Referrals to Regions 361 628 657 702 841 665 588

Asylum seekers

How many asylum seekers have come to Canada through ports of entry in 2025?

  • Asylum claims in air mode: 11,747
  • Asylum claims in land mode: 21,462
  • Asylum claims between the Ports of Entry (based on people brought to CBSA by PoJ): 1,840
    • This figure is included in the Asylum Claims in land mode
  • This represents a 43% decrease in overall claims since last year (2024)
  • The highest number of claims were at the Lacolle Port of Entry in Quebec, with 15,333 claimants (an increase of 186% over last year – 5,360 claims in 2024)

All data is as of

CBSA Asylum Claims by Year - All Modes
2021 2022 2023 2024 2025
Claimants 13,052 64,551 72,089 59,401 34,015

Chart showing claims over last 5 calendar years (CBSA only)

CBSA land border refugee claims: 2020-2026

Claimant type 2020 2021 2022 2023 2024 2025 2026 Grand total
Regular 2,473 5,251 7,554 15,783 14,734 19,622 2,291 67,708
Irregular 3,288 4,029 39,251 14,693 1,179 1,840 220 64,500
Grand total 5,761 9,280 46,805 30,476 15,913 21,462 2,511 132,208
As of
  • In 2020-2021, land border refugee claims low numbers were a direct reflection of the impacts of the Covid Pandemic
  • In 2022 and the early part of 2023, as Covid restrictions eased the number of land border claimsincreased sharply
    • A significant number of these claims were irregular claims between the Ports of Entry
  • With the implementation of the STCA-AP on the number of irregular claims were greatly reduced
    • However, regular claims began increasing after the STCA-AP implementation
  • Since its implementation, regular Claims have been around approximately the 15,000 per annum
    • However, in 2025 the number increased to almost 20,000 claims
      • This was mostly due to two periods of increased claims due to an influx of Haitian Nationals specifically at the Saint-Bernard-de Lacolle POE in Quebec
        • The influx can be attributed to the expiration of the Cuba, Haiti, Nicaragua, and Venezuela Parole program in the United States announced on
        • Additional announcements from the United States regarding the pending termination of Temporary Protected Status designations for specific nationalities such as Haiti, Somalia, Honduras, Nicaragua, Ethiopia, Venezuela, South Sudan, Nepal and Burma have increased the potential for asylum claims at Canadian land POE's

Bill C-12 (Strengthening Canada's Immigration System and Borders Act) Updates:

  • Received Royal Assent on March 26, 2026
    • Part 8, amends the Immigration and Refugee Protection Act (IRPA) to introduce two new ineligibility provisions
    • New Ineligibility provisions:
      • A101(1)(b.1) The person entered Canada after June 24, 2020 and waited more than 12 months to make a refugee claim
      • A101(1)(b.2) The person entered Canada from the United States between ports of entry and made their refugee claim 14 days or more after that entry
    • Application and Transitional Provisions
      • The new ineligibility provisions apply only to claims made on or after June 3, 2025
      • Claims made prior to that date are not subject to the new ineligibility provision
    • Claims found ineligible under the new provisions are not referred to the IRB
    • Claimants who are ineligible may apply for a Pre-Removal Risk Assessment (PRRA)
    • CBSA will continue to monitor any impact on CBSA volumes resulting from the coming into force of the new ineligibilities

Removals

Unsuccessful claimants represent the great number of cases entering the enforcement continuum, and being processed for removal. The surge in recent years of asylum claims has directly impacted the of the overall growth of the three of the four Removals Inventories.

Between 2020 and 2025, the Removal in Progress inventory increased by 63%, Recent efforts to increase removals have resulted in the volume stabilizing since 2024, with less than 1% growth from 2024 to 2025, and a slight decrease so far in 2026 (29,817 as of March).

The Removal Not Possible inventory experienced a similar level of growth over the same time period increasing by 60%. Nearly half of the cases in this inventory are subject to legislated stays of removal, including Administrative Deferrals of Removal and Temporary Suspensions of Removal. As a result, overall inventory levels continue to experience pressure despite increased enforcement activity. significantly increased.

Historic removal and inventory volume
2020 2021 2022 2023 2024 2025 2026 to date
Removals completed 12,854 7,514 8,330 15,224 17,389 23,047 4,356
Removals in progress 18,628 19,089 18,921 21,038 30,186 30,356 29,817

While the other inventories have grown, the Wanted Inventory, has remained relatively stable growing only 4% between 2020 and 2025. The low level of growth in the Wanted inventory, shows non-compliance represent a relatively small and stable component of overall system pressure.

The Canada Border Services Agency has been working in recent years to increase the number of removals completed in each year. The CBSA received 55.5 million dollars under the Border Plan to increase removals by 25 percent, from 16,000 to 20,000 in 2025-2026 and 2026-2027. In 2025, the CBSA removed 22,576 individuals (Data extracted on January 29th, 2026 and published on the website. As of April 2026, the total enforced removals in 2025 has exceeded 23,000).

Removals inventory by year
2020
Dec
2021
Dec
Change from 2020 2022
Dec
Change from 2021 2023
Dec
Change from 2022 2024
Dec
Change from 2023 2025
Dec
Change from 2024 Overall Change (2020–2025) 2026
Mar
Not Yet Actionable 148,209 128,008 minus14% 152,795 19% 255,999 68% 402,975 57% 477,651 19% 222% 484,684
Removal Not Possible 16,142 15,948 minus1% 19,960 25% 20,505 3% 20,755 1% 25,899 25% 60% 28,078
Wanted 32,290 29,338 minus9% 29,431 0% 29,382 0% 29,931 2% 33,501 12% 4% 33,483
Removal in Progress 18,628 19,089 2% 18,921 minus1% 21,038 11% 30,186 43% 30,356 1% 63% 29,817
Total 215,269 192,383 minus11% 221,107 15% 326,924 48% 483,847 48% 567,407 17% 164% 576,062
As of March 16, 2026

Definitions

  • Not Yet Actionable inventory includes individuals that fall outside of the enforcement stream including those pending refugee determination, a percentage of which will eventually enter Removals In Progress inventory, and convention refugees
  • Removal Not Possible inventory includes individuals that cannot currently be removed, including those pending Federal Court appeals, criminal charges, or Pre-Removal Risk Assessments, or serving a sentence of imprisonment
  • Wanted inventory includes individuals who failed to appear for removal proceedings and the CBSA is working to locate
  • Removal In Progress inventory includes individuals who can be processed for removal; at this stage, CBSA works with the individual and foreign countries to overcome challenges to removal, including the issuance of travel documents

Removals statistics

Removals by region

The CBSA collects removal data for all of Canada and organizes the data according to 7 regions.

Table 1.1: Total enforced removals by region (calendar year: 2019 to 2024 and quarterly for 2025)

Region 2019 2020 2021 2022 2023 2024 2025 Q1 2025 Q2 2025 Q3 2025 Q4Tablenote 1 2025 TotalTablenote 1
Atlantic 139 57 69 60 104 158 49 59 27 48 183
Quebec 2,633 5,920 1,592 2,487 6,021 6,947 2,353 2,195 3,459 2,481 10,488
Northern Ontario 386 284 234 294 410 489 124 159 130 129 542
Greater Toronto Area 4,343 4,499 3,655 2,714 4,304 5,402 1,859 1,881 1,722 1,300 6,762
Southern Ontario 898 204 304 698 1,346 1,075 294 249 253 185 981
Prairie 967 966 830 588 770 1,112 375 338 443 377 1,533
Pacific 1,903 921 829 1,478 2,252 2,174 603 529 531 424 2,087
Grand total 11,269 12,851 7,513 8,319 15,207 17,357 5,647 5,410 6,565 4,944 22,576

Removals inventory by year

Table 1: Removals inventory movement by year
2021
February
2022
February
Change from 2021 2023
February
Change from 2022 2024
February
Change from 2023 2025
February
Change from 2024 2026
February
Change from 2025 Overall Change (2021–2026)
Not Yet Actionable 141,321 126,755 minus10% 155,514 23% 277,549 78% 420,061 51% 484,183 15% 243%
Removal Not Possible 15,474 15,936 3% 20,038 26% 21,066 5% 20,318 minus4% 27,560 36% 78%
Wanted 31,376 28,995 minus8% 29,295 1% 29,248 0% 31,276 7% 33,511 7% 7%
Removal in Progress 19,269 19,806 3% 19,012 minus4% 21,061 11% 30,446 45% 29,000 minus5% 51%
Total 207,440 191,492 minus8% 223,859 17% 348,924 56% 502,101 44% 574,254 14% 177%
Data is extracted from an archive repository, and is reflective of the nearest available data snapshot nearest to the month-end listed.
  • The Removal in Progress inventory has grown by 51% over the last five years; due to efforts to increase removal volumes under the Border Plan, the inventory decreased by 5% from to 2026
  • Over five years, the Wanted inventory has fluctuated year to year, and has grown 7% overall; it grew by 2,135 cases since 2021, while during the same period, the CBSA removed over 75,800 inadmissible foreign nationals from Canada
  • Of the total 27,560 individuals in the Removal Not Possible inventory, 14,071 are subject to ADR/TSR stay (see table 6)
  • CBSA removal efforts may be hindered and delayed by impediments such as uncooperative foreign nationals who do not provide necessary information or documentation to allow for their removal, or foreign governments that refuse the return of their nationals, or fail to promptly issue timely travel documents. The CBSA works closely with foreign governments, Canadian officials abroad, and other departments to resolve these challenges, and participates in international forums to identify joint strategies and best practices to achieve timely removals of inadmissible persons

Definitions

  • Not Yet Actionable inventory includes individuals that fall outside of the enforcement stream including those pending refugee determination, a percentage of which will eventually enter Removals In Progress inventory, and convention refugees
  • Removal Not Possible inventory includes individuals that cannot currently be removed, including those pending Federal Court appeals, criminal charges, or Pre-Removal Risk Assessments, or serving a sentence of imprisonment
  • Wanted inventory includes individuals who failed to appear for removal proceedings and the CBSA is working to locate
  • Removal In Progress inventory includes individuals who can be processed for removal; at this stage, CBSA works with the individual and foreign countries to overcome challenges to removal, including the issuance of travel documents

Removals inventory by month

Table 2: Removals inventory movement by month
  Overall Change (Feb – Feb)
Not yet Actionable 413,067 420,061 424,359 431,949 438,232 442,792 449,981 456,664 462,003 468,268 473,009 477,651 481,897 484,183 17%
Removal not Possible 20,424 20,318 20,752 21,555 21,753 22,260 22,392 23,137 23,893 25,343 25,692 25,899 26,764 27,560 35%
Wanted 30,488 31,276 31,385 31,642 31,944 32,224 32,439 32,790 32,764 33,162 33,371 33,501 33,458 33,511 10%
Removal in Progress 30,372 30,446 31,305 30,861 30,795 30,729 30,675 30,357 30,360 29,540 30,020 30,356 29,625 29,000 minus5%
Total 494,351 502,101 507,801 516,007 522,724 528,005 535,487 542,948 549,020 556,313 562,092 567,407 571,744 574,254 16%
Data as of
  • The Removal in Progress inventory has remained relatively stable, fluctuating by up to 5% per month and decreasing overall by 5% over the last 12 months due to increased efforts on removals since
  • The CBSA prioritizes removals based on a risk management regime that assigns the highest priority to cases involving security, organized crime, crimes against humanity, and criminality. These are followed by failed refugee claimants as second tier, and all other inadmissible persons as the lowest priority
  • In 2025, the CBSA removed an average of 443 individuals per week, including administrative removals, while over 600 new cases entered the inventory per week

Removals caseload with serious inadmissibility by year

Table 3: Removals caseload with criminality
  Serious Inads.
-
Overall Change
(2024-2026)
  Total Total Total Serious Inads. Other Inads. Serious % Total Serious Inads. Other Inads. Serious % Total Serious Inads. Other Inads. Serious %
Not yet Actionable 126,755 155,514 277,549 1,021 276,528 0.4% 420,061 1,123 418,938 0.3% 484,183 1,336 482,847 0.3% 23.6%
Removal not Possible 15,936 20,038 21,066 2,876 18,190 13.7% 20,318 3,065 17,253 15.1% 27,560 3,146 24,414 11.4% 8.6%
Wanted 28,995 29,295 29,248 867 28,381 3.0% 31,276 885 30,391 2.8% 33,511 957 32,554 2.9% 9.4%
Removal in Progress 19,806 19,012 21,061 1,255 19,806 6.0% 30,446 1,448 28,998 4.8% 29,000 1,623 27,377 5.6% 22.7%
Total 191,492 223,859 348,924 6,019 342,905 1.7% 502,101 6,521 495,580 1.3% 574,254 7,062 567,192 1.2% 14.8%
Data as of
  • Since 2024, the total number of cases involving a serious inadmissibility has increased by 9.4% for the Wanted inventory, although the rate of serious inadmissibilities has remained steady at 3% of the Wanted caseload
  • The number of serious inadmissibility cases increased by 23% for Removal in Progress inventory, but the rate dropped from 6.0% to 5.6%
  • The overall rate of serious inadmissibilities within the entire removal inventory has slightly decreased from 1.7% in 2024 to 1.2% in 2026
  • Serious inadmissibilities include:
    • s. 34 – national security; terrorism; espionage
    • s. 35 – human and international rights violations
    • s. 36 – criminality, including in-Canada or outside-Canada serious and non-serious criminality
    • s. 37 – organised crime

Removals inventory with serious inadmissibility by month

Table 4: Removals caseload with serious inadmissibility – 12 months
    Change (Feb - Feb)
Not yet Actionable Total 420,061 424,359 431,949 438,232 442,792 449,981 456,664 462,003 468,268 473,009 477,651 481,897 484,183 15%
Serious inads. 1,123 1,108 1,135 1,158 1,164 1,204 1,224 1,267 1,280 1,282 1,313 1,325 1,336 19%
Other inads. 418,938 423,251 430,814 437,074 441,628 448,777 455,440 460,736 466,988 471,727 476,338 480,572 482,847  
% Serious 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%  
Removal not Possible Total 20,318 20,752 21,555 21,753 22,260 22,392 23,137 23,893 25,343 25,692 25,899 26,764 27,560 36%
Serious inads. 3,065 3,042 3,084 3,085 3,114 3,139 3,139 3,133 3,173 3,174 3,199 3,166 3,146 3%
Other inads. 17,652 18,108 18,878 19,075 19,557 19,667 20,408 21,171 22,588 22,941 23,132 24,030 24,838  
% Serious 15.1% 14.7% 14.3% 14.2% 14.0% 14.0% 13.6% 13.1% 12.5% 12.4% 12.4% 11.8% 11.4%  
Wanted Total 31,276 31,385 31,642 31,944 32,224 32,439 32,790 32,764 33,162 33,371 33,501 33,458 33,511 7%
Serious inads. 885 889 884 888 899 914 926 930 932 933 929 933 957 8%
Other inads. 30,391 30,496 30,758 31,056 31,325 31,525 31,864 31,834 32,230 32,438 32,572 32,525 32,554  
% Serious 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.8% 2.9%  
Removal in Progress Total 30,446 31,305 30,861 30,795 30,729 30,675 30,357 30,360 29,540 30,020 30,356 29,625 29,000 minus5%
Serious inads. 3,218 3,291 3,286 3,278 3,279 3,291 3,358 3,389 3,403 3,435 3,428 3,489 3,537 10%
Other inads. 27,228 28,014 27,575 27,517 27,450 27,384 26,999 26,971 26,137 26,585 26,928 26,136 25,463  
% Serious 10.6% 10.5% 10.6% 10.6% 10.7% 10.7% 11.1% 11.2% 11.5% 11.4% 11.3% 11.8% 12.2%  
Total Total 502,101 507,801 516,007 522,724 528,005 535,487 542,948 549,020 556,313 562,092 567,407 571,744 574,254 14%
Serious inads. 6,521 6,552 6,621 6,633 6,658 6,720 6,795 6,859 6,924 6,958 7,011 7,047 7,062 8%
Other inads. 495,580 501,249 509,386 516,091 521,347 528,767 536,153 542,161 549,389 555,134 560,396 564,697 567,192  
% Serious 1.3% 1.3% 1.3% 1.3% 1.3% 1.3% 1.3% 1.2% 1.2% 1.2% 1.2% 1.2% 1.2%  
Data as of
  • About 3% of the Wanted inventory cases involved a serious inadmissibility consistently over the last 12 months
  • For the Removal in Progress, the percentage of cases involving a serious inadmissibility has slowly risen over the past year, reaching 12.2% in
  • Foreign nationals still serving a criminal sentence or with pending criminal charges cannot be removed until the criminal matters are resolved. These cases are subject to a legislated stay of removal and are found in the Removal Not Possible inventory, leading to its significantly higher proportion of cases with criminality. CBSA may issue a warrant for arrest to ensure that CBSA is notified following the completion of their criminal custody

[Redacted]

[Redacted]

*[Redacted]

  • [Redacted]

[Redacted]

  • [Redacted]
  • [Redacted]
  • [Redacted]
  • [Redacted]
  • [Redacted]
  • [Redacted]
  • [Redacted]
  • [Redacted]

Administrative deferrals of removal and temporary suspensions of removal

Table 6: Top countries under ADR/TSR in Removal not Possible inventory
Country Inventory cases
Haiti 7,399
Democratic Republic of the Congo 2,653
Venezuela 1,157
Democratic Republic of Somalia 913
Afghanistan 592
Iraq 354
Iran 221
Republic of Mali 214
Syria 157
Libya 88
Remaining 325
Total 14,071

As of

  • An Administrative Deferral of Removal is a temporary measure imposed by the CBSA to defer removals when country conditions exist that could seriously endanger the lives or safety of the entire civilian population. It is not meant to address persistent and systemic human rights problems which constitute individual risk. CBSA monitors global events and provides assessments and recommendations to the delegated decision maker, the Director General of Inland Enforcement, on where and when, to impose or lift ADRs
    • There is currently an active ADR in place for certain regions in Somalia (Middle Shabelle, Afgoye, and Mogadishu), the Gaza Strip, Ukraine, Syria, Mali, the Central African Republic, South Sudan, Libya, Yemen, Venezuela, Haiti, Iran, Sudan, Israel, and Lebanon
  • A Temporary suspension of Removals is imposed by the Minister of Public Safety and interrupts removals to a country, when country conditions exist that could seriously endanger the lives or safety of the entire civilian population. It is not meant to address persistent and systemic human rights problems which constitute individual risk
    • There are active TSR for in place for Afghanistan, the Democratic Republic of Congo, and Iraq
  • Individuals who benefit from an ADR or a TSR are located in the Removal Not Possible inventory. Individuals who have failed to comply with a reporting condition may be captured in the wanted inventory until they are located. Individuals inadmissible for safety or security concerns do not benefit from the ADR or TSR and will be located in the removal in progress inventory or wanted inventory depending on the specific details of their case
  • Individuals with serious inadmissibility such as national security and criminality do not benefit from a stay of removals under these provisions
  • There are just over 14,000 ADR/TSR cases in the inventory, 98% of which are for the top ten countries

Removals enforced

Table 7: Removals enforced by month
  2025 Total
Removals completed 1,657 1,878 2,124 1,982 1,712 1,725 2,514 2,419 1,725 1,647 2,051 1,613 23,047 2,600 1,170
With a serious inadmissibility 103 74 91 114 91 119 105 90 107 97 99 91 1,181 94 102
Other inadmissibility 1,554 1,804 2,033 1,868 1,621 1,606 2,409 2,329 1,618 1,550 1,952 1,522 21,866 2,506 1,068
Serious inadmissibility % 6% 4% 4% 6% 5% 7% 4% 4% 6% 6% 5% 6% 5% 4% 9%

Data extracted on ; is the most recent complete month for which data is available.

  • In 2025, CBSA removed over 23,000 inadmissible foreign nationals, of which 1,181 (or 5%) involved a serious inadmissibility
  • The Border Plan provided $55.5 million to support immigration and asylum processing and to increase CBSA's capacity to reach 20,000 removals for fiscal years 2025-2026 and 2026-2027
  • The CBSA is on pace to exceed the target for fiscal years 2025-2026
Table 8: Removals enforced by year
  2020 2021 2022 2023 2024 2025 2026Tablenote 1 Total
Removals completed 12,854 7,514 8,330 15,224 17,389 23,047 4,356 88,714
With a serious inadmissibility 632 526 599 718 906 1,181 246 4,808
Other inadmissibility 12,222 6,988 7,731 14,506 16,483 21,866 4,110 83,906
Serious inadmissibility % 5% 7% 7% 5% 5% 5% 6% 5%
  • The 23,047 removals completed in 2025 are higher than any of the past five years
  • Of these, approximately 5% involved a serious inadmissibility

Escorted removals

Table 9: Escorted removals by month
  2025 Total
Removals completed 112 108 115 191 105 155 249 187 130 93 94 94 1,633 83 85

Year to date up to ; Includes escorted removals for international destinations and at land ports on entry.

Table 10: Escorted removals by year
  2020 2021 2022 2023 2024 2025 2026Tablenote 1
Removals completed 422 590 836 1,402 1,180 1,633 212
  • CBSA officers assess the risk of each case being removed and, for higher risk cases, recommend that escort officers accompany the foreign national to their destination to ensure the safety and security of the public, aircraft, and the foreign national themselves. Escort officers may also be deemed necessary by the airline, or to accompany a medical professional for foreign nationals with complex medical needs
  • In 2025, CBSA conducted over 1,600 escorted removals, representing approximately 7% of the total removals, and the highest volume in six years
  • On average, an unescorted removal costs $3,700, while an escorted removal costs around $12,500. In fiscal year 2024–25, the CBSA spent over $17.5 million on removal-related travel costs
Table 11: Top escorted removals destinations 2025
Country % of Total escorted
United States of America 55%
India 8%
Romania 3%
Mexico 3%
Nigeria 2%
Philippines 2%
Jamaica 2%
England 1%
Colombia 1%
France 1%
  • The U.S. accounted for 55% of the total escorts in 2025; over 90% of these occurred at land POEs
  • The top ten destination countries account for approximately 80% of total escorted removals

Iranian Regime

On , the Minister of Public Safety first designated the Iranian regime under paragraph 35(1)(b) of the IRPA from onwards. In , the Minister of Public Safety amended the start date of the designation from to . The designation makes any foreign national or permanent resident who were or are prescribed senior officials in the regime inadmissible to Canada.

As of , under the designation of the Iranian regime:

  • Approximately 17,800 applications were reviewed for potential inadmissibility
  • 239 visas have been cancelled by IRCC
  • 174 investigations have been opened by the CBSA
    • Additional investigations will be opened as new information becomes available
  • 79 investigations have been concluded by the CBSA, meaning the individuals in question were either not in Canada, or determined not to be a senior official in the Iranian regime and not inadmissible for this reason
    • The remaining cases are subject to ongoing investigations or enforcement action
  • 32 persons have been reported inadmissible by the CBSA for being a senior official in the Iranian regime
  • 23 cases involving individuals in Canada have been or will be sent to the Immigration Division (ID) of the IRB for an admissibility hearing
    • [Redacted] referrals were withdrawn by the CBSA before the case proceeded any further - A case may be withdrawn for several reasons, including the foreign national departing Canada prior to a scheduled hearing
  • The CBSA has requested the scheduling of 17 of these cases, while the rest continue to undergo preparations prior to being sent for scheduling. Of these:
    • 8 admissibility hearings have been concluded, resulting in decisions by the ID:
      • [Redacted] individuals were found inadmissible for being prescribed senior officials and issued deportation orders; [Redacted] has been removed from Canada
      • [Redacted] individuals were found not inadmissible by the ID; CBSA filed appeals to the Immigration Appeal Division (IAD) in [Redacted] cases
      • The CBSA has filed an application for leave and judicial review for the [Redacted] appeals that were dismissed by the IAD
    • CBSA subsequently withdrew [Redacted] case
    • 8 cases are ongoing

Extortion

File Inventory (as of ) Totals
Total # of open/active CBSA investigationsTablenote 1, Tablenote 2 372
Total # of removal orders issued (various inadmissibility grounds) 70
Total # of Completed Removals 35

Iranian regime designation

Question Period Note – CBSA –

Key messages

  • Let me be clear, CBSA officers are investigating Iranian nationals who are in Canada and who served in the IRGC or were senior members of the regime
  • Once evidence is gathered, they are referring the cases to the Immigration and Refugee Board and seeking a removal order

If pressed

Q1 – On the 700 put forward by StopIRGC:

  • This number cannot be validated
  • A couple years ago, a group of lawyers made this claim and CBSA followed up directly with them
  • Only a few names were provided and the CBSA has followed up on all of them
  • We encourage the public to send any tips to the CBSA Border Watch Line

Background

Issue: Ongoing concerns about individuals linked to the Iranian regime (IRGC) entering Canada without issue.

Information to support key messages

The Canada Border Services Agency (CBSA) works in an operating environment that changes on a daily basis and we are ready to respond and adapt as needed. Our strong response to suspected senior officials in the Iranian regime remains in place and the CBSA continues to take action to stop them from seeking or finding safe haven in Canada.

The CBSA takes its border protection responsibilities very seriously and works closely with domestic and international partners by regularly sharing relevant information on border and national security issues. This includes our support to Immigration, Refugees and Citizenship Canada (IRCC) which makes decisions on citizenship and immigration applications, including visas. Iranian nationals must apply for a visa to come to Canada and visa applicants are carefully assessed by IRCC. For more information on visa issuance please contact IRCC directly.

In , Canada designated the leadership of the Iranian government – including senior officials of the government, security, and intelligence agencies – as inadmissible to Canada for their engagement in terrorism and systemic and gross human rights violations. This designation, which was expanded in , is pursued under the Immigration and Refugee Protection Act (IRPA). It is a broadly applied mechanism aimed at ensuring that senior government officials who served from onward do not benefit from access to Canada. Additionally, it enables the CBSA to take immigration enforcement action against any regime member who may have already been in Canada prior to or since the designation. Members of the Islamic Revolutionary Guard Corps (IRGC) are also inadmissible to Canada under an additional provision of the IRPA. Following the regime designation and IRGC listing, visas have been cancelled, investigations launched, and admissibility hearings completed.

Additionally, Canada has taken domestic legislative action to criminalize support to terrorist entities, including those who are supported by Iran. In 2024, Canada listed the IRGC as a terrorist entity under the Criminal Code, in response to its terrorist acts both on its own and in knowing association with listed terrorist entities, such as Hizballah and Hamas. Canada remains gravely concerned by the Islamic Republic of Iran's actions and condemns their efforts to further destabilize peace and security across the Middle East. The Criminal Code terrorist listing regime is an important tool for countering terrorism in Canada and globally, and listing the IRGC reflects the government's commitment to keep people in Canada safe.

When the CBSA becomes aware of cases where a temporary or permanent resident inside Canada may be inadmissible as a senior official of the Iranian regime, the CBSA completes a thorough investigation. If after investigation the concern is well-founded, the CBSA will report the individual and refer the case to the Immigration and Refugee Board of Canada (IRB) as the decision-maker in these types of cases. If the IRB determines at the end of a hearing that the person is inadmissible, they will issue a removal order against them and the CBSA will then work to enforce their removal from Canada.

There are a number of factors that affect the ability to remove a person from Canada, including availability of subsequent applications that they can make, such as pre-removal risk assessment applications, and all persons are afforded due process against any decision made against them which can include seeking judicial review of those decisions. The CBSA only actions a removal order once a person has waived or exhausted all legal avenues of recourse that can stay the removal.

As of , under the designation of the Iranian regime:

  • approximately 17,800 applications were reviewed for potential inadmissibility
  • 239 visas have been cancelled by IRCC
  • 174 investigations have been opened by the CBSA
    • Additional investigations will be opened as new information becomes available
  • 79 investigations have been concluded by the CBSA, which means that the individuals in question were either not in Canada or determined not to be a senior official in the Iranian regime and therefore not inadmissible for this reason
    • The remaining cases are subject to ongoing investigations or enforcement action
  • 32 persons have been reported inadmissible by the CBSA for being a senior official in the Iranian regime
    • 23 cases involving individuals in Canada have been or will be sent to the Immigration Division (ID) of the IRB for an admissibility hearing
      • [Redacted] referrals were withdrawn by the CBSA before the case proceeded any further
    • The CBSA has requested the scheduling of 17 of these cases, while the rest continue to undergo preparations prior to being sent for scheduling. Of these 17 cases:
      • 8 admissibility hearings have been concluded, resulting in decisions by the ID:
        • [Redacted] individuals were found inadmissible for being prescribed senior officials and issued deportation orders. [Redacted] has been removed from Canada
        • [Redacted] individuals were found not inadmissible by the ID; CBSA has filed their appeal to the Immigration Appeal Division (IAD) in [Redacted] of these cases
      • In [Redacted] of these cases, the appeal was dismissed by the IAD which the CBSA has filed for judicial review of the decision
      • [Redacted] case has been subsequently withdrawn by the CBSA
      • 8 cases are ongoing

Traveller Modernization – Progress to date

Background

Traveller Modernization is a set of projects to implement new tools, processes and technology to allow more efficient processing of low-risk travellers.

Budget 2021 provided the CBSA with $337.6 million and $26.6 million ongoing for this initiative.

It is composed the following components.

Completed

  • Legislative Changes: Will allow for greater use of digital reporting tools earlier in the travel continuum once regulatory amendments are in place – Delivered
  • Advance Declaration: Allows travellers arriving at 10 international airports the ability to submit their declaration in advance – Delivered
  • Traveller Compliance Indicator: Provides officers data-analytics driven information to help them make decisions – Delivered

In progress

  • Free Flow International to International Transit: Will enable travellers transiting through Canada to another country to do so without reporting to the CBSA – By
  • Biometrics Program and Framework: Will deliver a framework to guide the use of biometrics at the CBSA; will deliver a technical environment to conduct facial recognition research and evaluation – By
  • Digital Traveller Experience: Will deliver an app that allows travellers to submit their biometric identity information in advance (in other words, passport photo), declaration and select forms – By
  • Officer Experience: Will deliver a new system for officers that has all the information they need to process travellers in one place, replacing five 20+ old systems – By

Project benefits

  • Increase in overall efficiency in traveller processing
  • Increase overall effectiveness of traveller processing
  • Reduced transactional cost associated to traveller processing will result in cost avoidance
  • Improved business intelligence for effective and efficient program monitoring and delivery
  • Reduce fraud

Progress to date and near-term deliverables

What have we delivered thus far?

  • Legislative changes to allow greater use of digital reporting tools – 
  • Implemented Advanced Declaration in ArriveCAN at 10 airports that allows travellers to submit their customs declaration electronically – 
  • Developed a data-analytics driven "Compliance Indicator" that will help officers process compliant travellers more quickly – 
  • Drafted a biometric program framework to guide the use of biometrics at the CBSA – 

What are the near-term deliverables?

  • Regulatory and technical changes to allow international travellers transiting through Canada to another international destination to do so without reporting to the CBSA, a long-standing request from the air industry –
  • Soft launch of the new "Traveller Processing System" for officers – beginning in with national implementation occurring through to 2027
  • A framework and lab to conduct biometric research, testing and evaluation on facial recognition technologies –

Officer Experience

What will new system give officers?

  • All the information they need to process travellers in one place vs. toggling between 5 systems
  • Ability to view Advance Declarations submitted by travellers through the border app
  • Access to additional, AI-driven information to help them make release or refer decisions
  • Ability to digitally refer travellers, allowing primary officers to provide additional details to officers in secondary electronically

When will officers see these changes?

There are two phases of this project:

Phase 1 – Highway and Ferry:

  • Delivers 80% of the functionality required in the new officer system
  • Where? 117 highway and 9 ferry ports of entry
  • When? Execution has been underway since
  • Implementation is on track to begin in Summer 2026

Phase 2 – Commercial Air, Remote, Cruise and Rail:

  • Enhances the new officer system for use in remaining modes
  • Where? 54 airports, 12 cruise ship sites, 4 passenger rail sites
  • When? Execution is expected to begin in Fall 2027
  • Implementation is expected to begin in Early 2028

Roll-out of the new system is low risk.

  • It has been developed through extensive engagement of frontline officers and will be supported through extensive change management
  • It will begin with a few lanes at a few ports for a few months before national roll-out
  • If glitches arise during implementation, officers will be able to revert back to using the old systems

Digital Traveller Experience

What will the border app give travellers?

  • Ability to store their Digital Travel Credential, a digital version of a passport that contains their photo, and submit an advanced customs declaration using it
  • Ability to fill out select forms (for example, to declare currency)
  • Ability to estimate duties and taxes
  • Ability to access border crossing information

When will travellers see these changes?

This project has two phases, aligned to the Officer Experience project:

Phase 1 – Highway and Ferry:

  • Allows travellers to submit Advance Declaration, including biometrics (in other words, photo in their passport in advance of arrival)
  • Digitizes the Cross Border Currency Reporting form
  • Where? 117 highway, 9 ferry ports of entry, 10 airports that have AD
  • When? Execution is expected to begin in Fall 2026
  • Implementation is expected to begin in Early 2028

Phase 2 – Commercial Air, Remote, Cruise and Rail:

  • Allows travellers to submit Advance Declarations and biometrics in all modes
  • Enables integration with industry applications (for example, Air Canada app) for maximum uptake
  • Where? 33 airports, 12 cruise ship sites, 4 passenger rail sites
  • When? Execution is expected to begin in Fall 2027
  • Implementation is expected to begin in Early 2028

The CBSA has been in the planning stages for Phase 1 since . Given the CBSA's history with mobile applications, it is important that this project is planned carefully. As a result, the Agency has taken longer than expected to complete detailed planning.

Planning for Phase 1 is near completion. Phase 2 planning will begin in spring 2026, once new Treasury Board authorities are in place.

Strategic benefits

Enhance border security: By having travellers submit their Digital Travel Credential in advance of arrival, it allows for systematic document verification. Once travellers arrive, officers can focus their time on interviews and examinations rather than scanning passports. Officers will be able to review pre-arrival information for travellers who completed Advance Declaration in land mode, where no such information is available currently – unlike in air where advanced passenger information is run through the National Targeting Centre, officers currently have no visibility on who will be presenting themselves at the land border.

Meet air industry and traveller needs: Travellers who submit their declaration in advance are seeing up to 50% faster processing at customs on arrival. This will allow CBSA to manage expected travel volumes without requiring additional officers.

Keep pace with international partners: Canada's B5 and G7 partners have already deployed biometric and digital entry systems to streamline checks.

  • United States: Biometric border automation is resulting in a 25% reduction in wait times
  • Asia-Pacific hubs: End-to-end biometric journeys have resulted in a 30% reduction in wait times
  • United Kingdom: Biometric facial recognition eGates process travellers 27% faster than traditional eGates

Enable Indigenous mobility: In line with Canada's efforts to facilitate cross border mobility for Indigenous peoples, remote areas that are critical to Indigenous mobility will also benefit from digitally reporting to the CBSA, particularly in geographical areas that cannot easily access full-service ports of entry for clearance.

Create efficiencies: Officers are currently required to use multiple, segmented systems to process travellers. This creates inefficiencies at the border as officers need to login and out of multiple systems to access and input the required data throughout their shift.

Improve business intelligence: The multitude of data sources makes program reporting challenging since there are different systems in place in land and air, for conventional travellers and for trusted travellers, for primary inspection and for secondary examination.

Overview and funding

  • Traveller Modernization (TM) is a multi-year initiative that will result in reduced manual transactions, the retirement of legacy IT infrastructure, and improvements to the border experience, not only for frontline officers, but also for Canadians and visitors to Canada
  • Budget 2021 included $337.6 million one-time funding and $26.6 million in ongoing funds for TM
  • TM is composed of 4 projects and 4 enabling components as described below

    Projects

    Traveller Compliance Indicator

    • A data analytics-driven Compliance Indicator that provides BSOs a traveller's history, assisting them in determining whether to release or refer the traveller based on passage and enforcement data
    • Delivered:

    Digital Traveller Experience

    • A single application that enables travellers to voluntarily submit digital identity information (incl. biometrics), their declaration and other information (for example, forms) in all modes.
    • By

    Officer Experience

    • A new centralized processing platform that consolidates all the information and processes required to process a traveller regardless of mode while leveraging biometrics and data analytics to allow for a more efficient processing.
    • By

    NEXUS eGate Highway

    • Equipping 18 NEXUS highway lanes with special gates, cameras and an intercom so that travellers can be processed from a command centre within the port
    • Cancelled due to audio issues and increased costs with limited benefits to be realized

    Advance Declaration

    • A feature in ArriveCAN that allows air travellers at large international airports the option to submit their customs and immigration declaration electronically, up to 72 hours before they arrive in Canada
    • Delivered:

    Free Flow International to International Transit

    • Put in place infrastructure and system adjustments in targeted airports to enable free flow transit for international air travellers who are not entering Canada
    • By

    Biometrics Program and Framework

    • A program framework, standards, processes and tools to guide the use of biometrics at the CBSA; A technical environment to conduct research, testing and evaluation.
    • By

    Legislative and Regulatory Change

    • Modernizing CBSA's legislative and regulatory framework to enable greater use of digital tools earlier in the traveller continuum to support a right-touch experience at the border.
    • Legislation:
      Regulations: By
  • Officer Experience: CBSA officers are currently required to use multiple, segmented systems to process travellers. This creates inefficiencies at the border as officers need to login and out of multiple systems to access and input the required data. The multitude of data sources makes program reporting challenging. The systems currently used to process travellers are 20+ years old. The CBSA would have difficulties delivering timely and effective border services if these systems were to fail
    • TM will deliver a new system that will be used to process travellers in all modes that leverages data-analytics and displays comprehensive traveller information to officers in a single interface
  • Digital Traveller Experience: Travellers expect a digital, user-centric experience when interacting with commercial airlines and border services. The CBSA only receives pre-arrival information for travellers arriving via commercial airlines, limiting CBSA's ability to complete risk assessments in advance of arrival. Paper-based forms are susceptible to errors and take longer to process, impacting the CBSA and Government of Canada (GOC)'s timely access to information to deliver their mandate (for example, the Cross Border Currency Reporting form will be digitized to strengthen the Canada's commitment to the Anti-Money Laundering/Anti-Terrorist Financing regime)
    • TM will deliver a mobile application that enables travellers to voluntarily submit digital identity information (including biometrics) and their customs declaration in all modes in advance of arrival to enable officers to focus on high value tasks instead of administrative data collection. It will also provide the ability for travellers to electronically submit select paper-based forms in advance of their arrival to Canada, enabling timely access to information for the CBSA and GOC partners

Current status and timelines

  • Development of the Officer Experience Solution (OES) is well underway. A limited, "Early Access Deployment" to 4 highway ports of entry is planned for summer 2026 while the national deployment to all 117 highway and ferry sites will begin in early 2027
  • CBSA is finalizing its plans for the Digital Traveller Experience (DTE) project and plans to begin execution of the redesigned mobile solution for travellers in Fall 2026

Funding History of the Traveller Modernization Initiative

Following approval of the Submission for Digital Traveller Experience in , there will be $93.8 million in one-time project funding and $19.3 million ongoing left to draw down from the fiscal framework. This submission will also serve to bring the scope of the Cross Border Currency Reporting (CBCR) project into the DTE project.

TB submission Project costs Ongoing costs
Digital Traveller Experience – Remaining Definition 21,527,114  
Total TM funding drawn down 21,527,114 -
Total TM budget 337,638,123 26,599,999
Total TM funding drawn down – 106,344,825 4,324,220
Total TM funding drawn down – 84,425,619 2,933,547
Total TM funding drawn down – 31,524,813 -
Total TM funding drawn down – 21,527,114 -
Total TM funding remaining 93,815,752 19,342,232

History

Funding profile excluding EBP, PSPC and SSC costs (in millions $)
Initiative
(part of B2021 Modernizing Trade and Travel at our Borders)
Funding sought for CBSA (Full cost) Prior years total 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029 Total 2029-2030 and On-going
Theme: Traveller Modernization Original TB sub 106.3 over 7 years + 4.3 ongoing 64.7 10.8 4.1 [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
TB Sub 2: CBSA Delivering Traveller Modernization Through a Digital Traveller Experience and Officer Experience 84.4 over 7 years + 2.9 ongoing 26.8 34.0 2.5 [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
ARLU 2024-25 Reprofile (NEXUS)   (3.1) 3.1         [Redacted]  
TB Sub 3: CBSA Delivering Traveller Modernization Through Officer Experience (approved ) 37.6 over 5 years
Note: The additional amounts, including the $0.3 million ongoing, come from CBSA's own reference levels
  4.6 20.6 [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
ARLU 2026-27 Reprofile (Digital Traveller Experience and Officer Experience)       (4.5) [Redacted]     [Redacted]  
ARLU 2026-27 CER (Digital Traveller Experience and Officer Experience)         [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
Total Funding Accessed from the Fiscal Framework 222.3 over 7 years + 7.3 ongoing 88.4 52.5 22.6 [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
Remaining in the Fiscal Framework 115.3 to be accessed through future submissions             [Redacted] [Redacted]

Totals may not add due to rounding

The TB Submission (Funding for Modernizing and Sustaining Travel and Trade at our Borders) also sought access to $6.9 million for Cross Border Currency Reporting (Economic and Fiscal Snapshot 2020) and $25.0 million for ArriveCan (Budget 2022), not included in the financial tables in this 2-pager as they were not part of the Modernizing Travel and Trade at our Borders initiative announced in Budget 2021.

1,000 officers

  • As of April 2, 2026, the CBSA has hired 68 new CBSA officers, of the 1,000
    • This includes 42 Border Services Officers (BSO), 20 Trade Officers, 4 Chemists and 2 Detection Technology Engineers
  • By June, CBSA will have hired approximately 100 officers and will have 180 in training at the college in Rigaud
  • A new cohort of BSO trainees will start at the College every 5 weeks until we deliver on our commitment to hire 1,000 new officers by 2028-29 (see Annex 1). A cohort may include up to 72 BSO trainees
  • A portion of the officer trainees in each cohort will be dedicated to fulfilling the commitment to hire 1,000 new officers, while the others will be used to account for the attrition (retirement, departures) of existing officers
Annex 1: Total Hiring of New BSO and Other Officers, Per Year and by Function
Function 2025-2026 2026-2027 2027-2028 2028-2029 Ongoing
Commercial Operations 36 186 292 219 733
Traveller Operations 0 60 0 0 60
Sub total BSOs 36 246 292 219 793
Trade Operations 16 38 22 8 84
Recourse 0 11 0 0 11
Intelligence Operations 0 7 7 0 14
Targeting 0 18 3 0 21
Criminal Investigations 0 9 13 0 22
Inland Enforcement 0 10 10 0 20
National security screening 0 13 0 0 13
International 0 3 0 0 3
Science, Engineering & Technology 6 13 0 0 19
Sub total other officers 22 122 55 8 207
Total new officers per year 58 368 347 227 1000
Total cumulative new officers 58 426 773 1000  
Total cumulative new officers (%) 6% 43% 77% 100%  

Please Note: "Other functions" include International Liaison Officers, Recourse Officers, Chemists and Engineers.

Border Plan

What is the status of implementation of the border plan?

  • We have hired 30 Enforcement Case Officers to support removals
  • The Border Action Plan includes 75 frontline resources:
    • 33 frontline Border Services Officers (BSOs)
    • 3 Detector Dog Services teams
    • 12 regional laboratory Chemists
    • 7 Intelligence Officers
    • 7 Criminal Investigators
    • 6 Targeting Officers
    • 7 Engineers
  • 33 Border Services Officers began their in-house training at the CBSA College in Rigaud on . Twenty-four of these Border Services Officers completed and graduated in ; 9 backfills are being re-trained currently and are anticipated to be fully retrained by mid-October 2026. The 3 dog handlers graduated on
  • 2 Engineers were hired this fiscal year and are currently supporting operations. The other 3 Engineers, for a total of 5, will be hired in 2026–2027
  • There are also 2 engineering support personnel (1 for electronics and 1 for engineering and scientific support) that will be hired in 2026–2027
  • 4 Chemists were hired this fiscal year and are currently supporting operations. The other 8 Chemists, for a total of 12, will be hired in 2026–2027
  • The remaining frontline resources will be deployed in future years as follows:
    • 2026–2027:
      • 7 Intelligence Officers
      • 7 Criminal Investigators
      • 6 Targeting Officers
    • 2027–2028:
      • 3 Detector Dog Handlers
    • 2028–2029:
      • 3 Detector Dog Handlers

Investment Plan

The investment plan has five pillars for specific action

The five Pillars investment plan
Border Plan Pillars CBSA Elements
Detecting and disrupting the illegal fentanyl trade Acquire new tools for the CBSA frontlines
Introducing significant new tools for law enforcement

Amending the Customs Act to obligate industry partners to provide access to adequate accommodation and spaces when required to allow for the examination of exported goods by CBSA officers, while ensuring greater consistency between import and export requirements more generally.

Implement a set of amendments to the Proceeds of Crime (Money Laundering) and Terrorist Financing Act (PCMLTFA), including increases to administrative and criminal penalties and other compliance tools.
These amendments will give CBSA new authorities and reporting requirements to combat trade-based financial crimes.

CBSA to finalize the Memorandum of Understanding with U.S. to enable the sharing of bulk trade data to detect and deter cross-border trade-based money laundering, and other crimes.

Improving operational coordination Launch of the Joint Operational Intelligence cell which includes CBSA.
Expanding information sharing Increase effective and efficient information sharing with the US by establishing new data repositories to enhance data collection and reporting.
Minimizing unnecessary border volumes
  • Eliminate "flagpoling" by temporary residents in Canada
  • Increase the rate of removals for inadmissible people
  • Continue to take action to end illegal southbound movements

All Border Action Plan commitments with respect to CTB

  • In 2025–2026, the CBSA has deployed or is in the process of deploying:
    • 18 Raman devices
    • 3 Mobile Large-Scale Imaging devices
    • 2 Pallet Large-Scale Imaging device
    • 1 Fixed Large-Scale Imaging device
    • Small-Scale Imaging X-ray
    • 33 Border Services Officers
  • In 2026–2027, the CBSA plans to deploy:
    • 30 Raman devices
    • 3 Regional Satellite Laboratories
    • 25 Ion Mobility Spectrometers
    • 6 Mobile Large-Scale Imaging devices
    • 2 Pallet Large-Scale Imaging devices
    • Up to 6 Mobile Backscatter Imaging devices
    • 10 Small-Scale Imaging X-rays
    • 9 Computed Tomography Scans
    • 13 Ducted Fume Hoods
    • 3 Detector Dog Services teams
    • 12 Chemists
    • 14 Intelligence resources
    • 6 Targeting Officers
  • In fiscal year 2027–2028, the CBSA plans to deploy:
    • 30 Raman devices
    • 25 Ion Mobility Spectrometers
    • 4 Computed Tomography Scans
    • 2 Pallet Large-Scale Imaging devices
    • 3 Detector Dog Services teams
  • In fiscal year 2028–2029, the CBSA plans to deploy:
    • 25 Raman devices
    • 3 Detector Dog Services teams

Planned Detection Technology deployments (all sources of funds) – multi-year table

Detection Technology acronym legend
  • RAMAN: Hand-Held Raman Device
  • RSL: Regional Satellite Labs
  • IMS: Ion Mobility Spectrometer
  • LSI*: Large Scale Imaging - Portal or Drive Thru
  • M-LSI: Mobile Large Scale Imaging
  • P-LSI: Pallet Large Scale Imaging
  • F-LSI: Fixed Large Scale Imaging
  • MBI: Mobile Backscatter Imaging
  • CT Scan: Computed Tomography Scanner
  • SSI X-ray: Small Scale Imaging (various types)
Fiscal year 2025–2026 – Commitment / Deployments / Procurements
  ATL QC NOR GTA SOR PRA PAC LAB Total
RAMAN 1 5 1 3 - 1 6 1 18
RSL - - - - - - - - 0
IMS - - - - - - - - 0
M-LSI 1 - - - 1 - 1 - 3
P-LSI 1 - - - - - 1 - 2
F-LSI - - - - 1 - - - 1
MBI - - - - - - - - 0
CT Scan - - - - - - - - 0
SSI Xray - - - - 1 - - - 1
Ducted fumehood - - - - - - - - 0
Total 3 5 1 3 3 1 8 1 25
Fiscal year 2026–2027 – Commitment / Deployments / Procurements
  ATL QC NOR GTA SOR PRA PAC LAB Total
RAMAN 2 3 2 6 5 6 4 2 30
RSL - 1 - 1 - 1 - - 3
IMS 2 4 2 3 2 1 5 6 25
M-LSI 1 2 - - 1 - 2 - 6
P-LSI - - - - 1 - 1 - 2
F-LSI - - - - - - - - 0
MBI* 1 1 - 1 - - 1 2xTBC 6
CT Scan* - 2 - 2 - 3 2 - 9
SSI Xray - 1 1 1 2 2 3 - 10
Ducted fumehood 2 2 - 2 2 1 4 - 13
Total 8 16 5 16 13 14 22 10 104
Fiscal year 2027–2028 – Commitment / Deployments / Procurements
  ATL QC NOR GTA SOR PRA PAC LAB Total
RAMAN 4 6 1 3 7 3 5 1 30
RSL - - - - - - - - 0
IMS Locations TBC 25 25
LSI* Potential pivot – research on drive thru portals (3) 3
P-LSI - 1 - - - - 1 - 2
F-LSI - - - - - - - - 0
MBI - - 1 - 1 1 1 - 4
CT Scan - 1 - 1 - - 2 - 4
SSI Xray - - - - - - - - 0
Ducted fumehood - - - - - - - - 0
Total 4 7 2 3 8 4 11 29 68
Fiscal year 2028–2029 – Commitment / Deployments / Procurements
  ATL QC NOR GTA SOR PRA PAC LAB Total
RAMAN 4 4 4 2 3 5 2 1 25
RSL - - - - - - - - 0
IMS - - - - - - - - 0
LSI* Potential pivot – research on drive thru portals (4) 4
P-LSI - - - - - - - - 0
F-LSI - - - - - - - - 0
MBI - - - - - - - - 0
CT Scan - - - - - - - - 0
SSI Xray - - - - - - - - 0
Ducted fumehood - - - - - - - - 0
Total 4 4 4 2 3 5 2 5 29
Fiscal year 2029–2030 – Commitment / Deployments
  ATL QC NOR GTA SOR PRA PAC LAB Total
M-LSI 4 x M-LSI pivot to Portal in 2028–2029 4
SSI Xray 10 x SSI rolling out in 2026–2027 10
P-LSI 1 x Pallet to roll out in 2027–2028 1

While these units were originally set to deploy in 2029–2030, we are to trying to expedite when possible and have planned to roll these deployments into earlier years. These have been flagged with highlight in the tables above. All previous timelines have reflected this schedule.

Implementation dashboard

Fiscal year 2025-26: Implementation of the Border Action Plan
Detection technology Units Locations Detailed status update
Mobile Large Scale Imaging 3 Atlantic - Halifax Marine
  • Unit delivered
  • 10 Border Service Officers have completed Operator training.

Potential Delays: Site Acceptance Testing completed but not yet signed off. Repairs to e-stop and boom complete. Missing part was sourced, tested and works.
Training: Training resume as planned for February 19 to 20.
Impact: Final Operational Stress Testing and training will slip into early next fiscal year, money has been risk managed to avoid lapsing. Unit to be operational between now and mid-March.

Southern Ontario Region - Windsor
  • Unit delivered
  • 10 Border Service Officers have completed Operator training.

Potential Delays: Site Acceptance Testing completed but not yet signed off. Repairs to e-stop and boom complete. Following assessment of these repairs, training will resume.
Training: New training schedule to be confirmed pending assessment of deficiencies.
Impact: Final Operational Stress Testing and training will slip into early next fiscal year, money has been risk managed to avoid lapsing.

Pacific - Prince Rupert
  • Unit delivered

Potential Delays: Site Acceptance Testing completed but not yet signed off. Repairs to e-stop and boom complete. Prior to training in Prince Rupert, there will be a full inspection of that unit as it has been sitting idle since the Site Acceptance Testing. The technicians will spend a few days to do a full inspection in order to give green light before training commences.
Training: Operator training for this unit was scheduled and had to be cancelled. New dates: March 9 to 13 & March 16 to 20
Impact: Final Operational Stress Testing and training will slip into early next fiscal year, money has been risk managed to avoid lapsing.

Pallet Large Scale Imaging 2 Atlantic - Halifax
  • Unit delivered

Potential Delays: 10 days behind schedule due to damage during drilling and delays in delivery of the grout. Installation to continue as of February 18th. Construction license has been obtained, the commissioning license is expected by the end of the construction. As it stands, it can be built but not turned on.
Site Acceptance Testing: Anticipated to slip to // Training: Mid-Late
Impact: Despite training/ Operational Stress Testing slipping into next fiscal year, contract amendments have been made so that milestone payments will not lapse.

Pacific – Tsawwassen Container Examination Facility
  • Unit delivered

Potential Delay: Unit arrived in Montreal then sent to Pacific by rail. Rapiscan & CBSA are working closely to expedite the schedule where possible given 3 week delay during delivery. Construction license has been obtained, the commissioning license is expected by the end of the construction. As it stands, it can be built but not turned on. Install starting March 2nd.
Site Acceptance Testing: Anticipated to slip to // Training:
Impact: Despite training/Operational Stress Testing slipping into next fiscal year, contract amendments have been made so that milestone payments will not lapse. Commercial Trade Branch & Science & Engineering Branch are closely monitoring progress, delays and potential financial impacts.

Handheld Chemical Analysis 15 Multi
  • Contract in place
  • Units ordered for delivery prior to

Lead time: 2 months (off the shelf)
Locations: Atlantic – Halifax Container Exam Facility, Quebec – Montreal Leo Blanchette Postal Centre & Regional Satellite Lab, Montreal Air Cargo Regional Satellite Lab, Greater Toronto Area - Toronto Air Cargo & Regional Satellite Lab, Hamilton Airport, Toronto Postal Gateway Regional Satellite Lab, Prairie - Calgary Air Cargo & Regional Satellite Lab, Headquarters - CBSA Lab, Pacific - Vancouver Air Cargo Regional Satellite Lab, Vancouver Mail Centre, Tsawwassen Container Examination Facility & Prince Rupert Container Examination Facility

Fixed Large Scale Imaging 1 Southern Ontario Region – Gordie Howe International Bridge
  • Unit delivered, installed
  • Site Acceptance Testing complete
  • 40 Border Service Officers have completed Operator training

Potential Delays: There are still some minor deficiencies with the equipment and software that the vendor/CBSA/Bridge Authority are working together to address.
Notes: There is still no official open date for Gordie Howe International Bridge. Final Operational Stress Testing and training cannot take place until there is a secured date Any further updates will be supplied by the Bridge project team.

Small Scale Imaging 5 Southern Ontario Region – Gordie Howe International Bridge
  • Units delivered, officers trained.

Notes: There is still no official open date for Gordie Howe International Bridge. Final Operational Stress Testing and training cannot take place until there is a secured date Any further updates will be supplied by the Gordie Howe International Bridge project team.

Fiscal year 2026-27: Implementation of the Border Action Plan
Detection technology Units Locations Status update
Mobile Large Scale Imaging 6

Atlantic – Saint John, Southern Ontario Region – Fort Erie, Quebec – Lacolle; Montreal Tellier
Pacific - Vancouver Marine Operations (North); Delta (South)

Ordered:
Factory Acceptance Testing: Q1/Q2 2026 / Delivery: Q3/Q4 2026

Pallet Large Scale Imaging 2

Southern Ontario Region – Gordie Howe International Bridge
Pacific – Prince Rupert

Ordered: .
Factory Acceptance Testing: Q3 2026 / Delivery: Q4 2026

Handheld Chemical Analysis 25 All regions

Contract in place.
Lead time: 2 months (off the shelf)

Relocatable Small Scale Imaging 10

Quebec - Montreal Mail Centre, Greater Toronto Area - Interport Sufferance Warehouse
Southern Ontario Region - Windsor United Postal Service; Sault Ste. Marie – Commercial, Niagara/Rainbow Bus Terminal
Prairie - Winnipeg FedEx Ground; Winnipeg Highway Sufferance Warehouse
Pacific - Prince Rupert, Osoyoos – Commercial, Beaver Creek

Ordered:
Delivery:
*note: locations are currently being finalized*

Mobile Backscatter Imaging 6

Quebec – Montreal Marine, Greater Toronto Area – Toronto Inland
Atlantic – Halifax Marine
Pacific – Vancouver Marine, to be confirmed

Anticipated Contract Award date: .
Computed Tomography X-Ray 9

Quebec – Pierre Elliot Trudeau Airport; Montreal Marine
Greater Toronto Area – Pearson Airport; Hamilton Airport;
Prairie – Winnipeg Airport; Edmonton Airport; Calgary Airport
Pacific – Vancouver Airport; Burnaby Container Examination Facility

High risk -- No contract in place.
Invitation To Qualify anticipated:
Request For Proposal anticipated: Q1 26/27
Expected Contract Award Date: August/

Regional Satellite Lab 3

Greater Toronto Area – Pearson Air Cargo
Prairie – Port of Entry to be confirmed
Quebec – Port of Entry to be confirmed

Greater Toronto Area: Likely to slip beyond - pending decisions on schedule, costing and Section 6.
Quebec: Section 6 & Operational Engagement underway
Prairie: Operational Engagement underway

Ducted Fume Hoods
(Snorkel Vent)
13

Atlantic - Halifax Container Examination Facility, Saint John Container Examination Facility,
Quebec – Montreal Air Cargo, Montreal Tellier Container Examination Facility
Prairie - Calgary Air Cargo,
Greater Toronto Area - Toronto Air Cargo, Hamilton Air Cargo
Southern Ontario Region - Gordie Howe International Bridge, Sarnia
Pacific - Vancouver Mail, Tsawwassen Container Examination Facility, Burnaby Container Examination Facility, Prince Rupert Container Examination Facility

Section 6 & Operational Engagement underway
Ion Mobility Scanners 25 All regions

Work on Statement Of Work still underway.
Estimated contract award date:

Fiscal year 2027-28: Implementation of the Border Action Plan
Detection technology Units Locations Status update
Pallet Large Scale Imaging 2

Quebec – Montreal Marine
Pacific – To be determined

Contract in place.
Order to be placed by end of Q4 for Montreal.

Handheld Chemical Analysis
(RAMAN)
30 All regions

Contract in place.
Lead time: 2 months (off the shelf)

Mobile Backscatter Imaging 4

Northern Ontario Region - Fort Frances (Rail)
Southern Ontario Region - Sarnia (Rail)
Prairie - North Portal (Rail)
Pacific - Pacific Highway (Rail)

Anticipated Contract Award date: .
Technology pivot possible*research and development underway with United States Customs Border Patrol on mass screening portals.

Computed Tomography X-Ray 4

Quebec – Montreal Leo Blanchette Postal Centre
Greater Toronto Area – Toronto Postal International Mail Postal Centre
Pacific – Vancouver International Mail Centre, Container Examination Facility

No contract in place.
Request For Proposal anticipated: Q1 26/27

Ion Mobility Scanners 25

Pacific - Nanaimo
To be determined - An analysis for the remaining 24 units is still undergoing

Work on Statement of Work still underway.
Estimated contract award date:

Large Scale Imaging* 3

To be determinedDrive-thru portals being explored.

Technology pivot possible* research and development underway with United States Customs Border Patrol on mass screening portals.

Fiscal year 2028-29: Implementation of the Border Action Plan
Detection technology Units Locations Status update
Handheld Chemical Analysis
(RAMAN)
25 All regions

Contract in place.
Lead time: 2 months (off the shelf)

Large Scale Imaging* 4

To be determinedDrive-thru portals being explored.

Technology pivot possible* research and development underway with United States Customs Border Patrol on mass screening portals.

Fiscal year 2025-26: Border Action Plan – HR Plan – Implementation status
  Locations Status

BSOs
Total: 33

Atlantic (6) Halifax Marine

33 Border Services Officers began their training at Rigaud on .

Anticipated Graduation:

Quebec (4) Montreal Pierre Elliot Trudeau Airport

Greater Toronto Area Region (4) Pearson Airport

Pacific (8) Prince Rupert

Southern Ontario Region (10) Windsor Ambassador Bridge

Northern Ontario Region (1) Lansdowne

Engineers
Total: 2

Headquarters (2) CBSA Lab

2 engineers were hired this fiscal year and are currently supporting operations

Fiscal year 2026-27: Border Action Plan – HR Plan – Implementation status
  Region and locations Status

Detector Dog Handlers
Total: 3

Prairie (1) Winnipeg Airport

The 3 handlers are currently in training at the CBSA College.

Anticipated Graduation:

Atlantic (1) Halifax Airport

Pacific (1) Kingsgate

Intelligence Officers
Total: 7

Atlantic (1) To be determined

Hiring is currently underway with consultations occurring with the College regarding backfills

Quebec (1) To be determined

Northern Ontario Region (1) To be determined

Southern Ontario Region (1) To be determined

Greater Toronto Area Region (1) To be determined

Prairie (1) To be determined

Pacific (1) To be determined

Investigators
Total: 7

Quebec (1) To be determined

Hiring is currently underway with consultations occurring with the College regarding backfills

Greater Toronto Area Region (2) To be determined

Prairie (1) To be determined

Pacific (3) To be determined

Chemists
Total: 12

Pacific (1) Vancouver Air Cargo Regional Satellite Lab(1)

1/12 chemists were hired this fiscal year and are currently supporting operations.

Interviews are currently taking place in the Greater Toronto Area for the next round of hires.

Greater Toronto Area Region (4) Pearson Air Cargo Regional Satellite Lab (3); Toronto
Postal International Mail Postal Centre Regional Satellite Lab(1)

Quebec (4) New Regional Satellite Labs – location to be determined (3); Montreal Leo Blanchette Postal Centre (1)

Prairie (3) New Regional Satellite Lab – location to be determined

Engineers
Total: 3

Headquarters (3) CBSA LAB

Hiring was underway – at risk. Was on hold from Headquarter staffing hold resulting in delays.
Science & Engineering has submitted two staffing packages for an ENG-03, ENG-04, ENG-05

National Targeting
Centre Targetters
Total: 6

Headquarters (6) National Targeting Centre

Hiring was underway – hold on Headquarter permanent staffing, temporary measures will be used in the interim.
Consultations with the College regarding backfills were underway for Q4 this Fiscal Year – On hold. With temporary measures being used, backfills will not be required at this time.

Engineering/Electrical Support – Total: 2

Headquarters (2) CBSA Lab

Hiring was underway – at risk. Was on hold from Headquarter staffing hold resulting in delays.

Fiscal year 2027-28: Border Action Plan – HR Plan – Implementation status
  Locations Status

Detector Dog Handlers
Total: 3

Southern Ontario Region (1) location to be determined

Consultations with the College regarding backfills are underway. Ongoing salaries to be paid for by 1,000 Officers Treasury Board Sub which has not yet been approved (backfills covered by Fall Economic Statement).

Atlantic (1) - Edmonton Airport

Pacific (1) - Victoria

Fiscal year 2028-29: Border Action Plan – HR Plan – Implementation status
  Locations Status

Detector Dog Handlers
Total: 3

Quebec (2) - Pierre Elliot Trudeau Airport; Lacolle

Consultations regarding training and hiring is planned for 27/28. Ongoing salaries to be paid for by 1,000 Officers Treasury Board Sub which has not yet been approved (backfills covered by Fall Economic Statement).

Greater Toronto Area Region (1) - Pearson Airport

Deployment timeline

2025-2026
Tool Status Units Region Funding source
Handheld Raman Anticipated to be completed this fiscal 15 Multi Fall Economic Statement
Pallet Large Scale Imaging Anticipated to leak into next fiscal, minimal risk (finances handled) 1 ATL Fall Economic Statement
Pallet Large Scale Imaging Anticipated to leak into next fiscal, minimal risk (finances handled) 1 PAC Restoring the Front Line
Mobile Large Scale Imaging Anticipated to leak into next fiscal, minimal risk (finances handled) 2 ATL/PAC Detection Technology Control Fund
Mobile Large Scale Imaging Anticipated to leak into next fiscal, minimal risk (finances handled) 1 SOR Restoring the Front Line
Imagerie fixe à grande échelleFootnote 1 Anticipated to be completed this fiscal 1 SOR Gordie Howe International Bridge
Fixed Large Scale ImagingFootnote 1 Anticipated to be completed this fiscal 5 SOR Gordie Howe International Bridge
2026-2027
Tool Units Region Funding source
Ducted Fume Hoods 13 Multi Fall Economic Statement
Handheld Raman 25 All Fall Economic Statement
Handheld Raman 5 PAC Marine Container Exam Facility
Ion Mobility Spectrometer 25 All Fall Economic Statement
Mobile Backscatter ImagingFootnote 2 4 Multi Fall Economic Statement
Mobile Large Scale Imaging 3 Multi Fall Economic Statement
Mobile Large Scale Imaging 2 PAC Marine Container Exam Facility
Pallet Large Scale Imaging 1 PAC Marine Container Exam Facility
Regional Satellite Laboratories 3 Multi Fall Economic Statement
Small Scale Imaging X-ray 10 Multi Fall Economic Statement
Mobile Backscatter Imaging 2 GTA/QC Stolen Vehicles
Mobile Large Scale Imaging 1 QC Detection Technology Control Fund
Computed Tomography Scanner 9 Multi Initiative to Take Action Against Gun and Gang Violence
Pallet Large Scale Imaging 1 SOR Gordie Howe International Bridge
2027-2028
Tool Units Region Funding source
Handheld Raman 30 All Fall Economic Statement
Ion Mobility Spectrometer 25 All Fall Economic Statement
Mobile Backscatter ImagingFootnote 3 4 Multi Fall Economic Statement
Large Scale ImagingFootnote 3 3 Multi Fall Economic Statement
Pallet Large Scale Imaging 2 QC/PAC Fall Economic Statement
Computed Tomography Scanner 4 Multi Initiative to Take Action Against Gun and Gang Violence
2028-2029
Tool Units Region Funding source
Large Scale ImagingFootnote 3 4 Multi Fall Economic Statement
Handheld Raman 25 All Fall Economic Statement

Handheld RAMAN: unit ordered, to be delivered this fiscal

Pallet large scale imaging: units have been delivered in Canada, sites are being prepared and work has begun but final milestones will leak in 2026/27. Minimal risk as contract milestones have been amended, and finances will not lapse.

Mobile large scale imaging: units have been delivered, Site Acceptance Testing complete but not signed off. All issues with e-stop/boom were rectified. Final milestones will leak in 2026/27. Minimal risk as contract milestones have been amended, and finances will not lapse.

Fixed large scale imaging/ Small scale imaging: units have been delivered but final Operational Stress Testing and training cannot be completed until there is a secured Gordie Howe International Bridge opening date. All further milestones to be handled by Bridge project team.

Following the decision at Executive Committee Projects on , the following equipment will be ordered and delivered to Pacific Region in 26/27.

2 x Mobile Large Scale Imaging – Ordered , anticipated delivery: Q3/Q4 2026 ($8 million)

1 x Pallet Large Scale Imaging - Ordered , anticipated delivery: Q4 2026 ($4.8 million)

5 x RAMAN – Contract in place, lead time is 2 months. Order to be placed in early Q1 2026/27 (400,000)

0.5 x Mobile Backscatter – No contract in place yet. Anticipated Contract Award date: ($1 million)

This will free up $14.2 million of Fall Economic Statement funding in future years for Agency priorities such as mass-screening or other technology needs at new Ports. Project close out documents will be prepared and presented once all equipment has been delivered.

Comprehensive Expenditures Review

[Redacted]

IT outages

  • Beginning on , the CBSA experienced multiple outages to major IT systems that resulted in delays in travellers and commercial processing
  • We recognize the impacts felt by travellers and traders when IT systems are down, which is why the CBSA has been working hard on a plan to better address outages when they occur and to prevent them from happening in the first place
  • Since the major outage last fall, a joint report by the CBSA and SSC has identified key causes and measures to better-prevent and mitigate outages. CBSA has been engaging air travel and commercial and trade stakeholders throughout the fall and winter to keep them updated on progress, and this will continue going forward
  • Budget 2025 has committed to reducing the cost of using and maintaining CBSA equipment and IT assets by decommissioning legacy software applications
  • In the event of an outage, the CBSA makes every effort to ensure an adequate number of primary inspection lines are open, while at the same time maintaining normal operations such as customs and immigration services, secondary examinations, enforcement activities, and commercial processing
  • Throughout an outage, the CBSA collaborates closely with airport and bridge authorities to facilitate the flow of travellers and commercial goods
  • Safety and security standards are upheld at all times, with border services officers working to verify travellers' identities, receive their declarations, and conduct any additional screening warranted by each traveller's individual circumstances. The CBSA works closely with airport and airline management to expedite traveller processing, minimize delays, and complete verifications as required
  • The CBSA has a System Outage Contingency Plan for Commercial processes that was developed in partnership with industry. The plan outlines requirements for reporting commercial transactions during an outage. It also provides guidance on the electronic submission of data once the system is back online. The CBSA accepts paper documentation during an outage and waives Administrative Monetary Penalties for Advance Commercial Information related infractions resulting from the outage
  • In the event of an outage of airport Primary Inspection Kiosks, travellers are re-directed to the primary inspection lines for manual processing. Outage protocols have been reviewed and re-iterated with CBSA operations and air industry partners to support business continuity at the border
  • As requested by the Minister of Public Safety, the CBSA and SSC provided a report on the September/October outages to their respective Ministers on . The CBSA and SSC closely examined the key causes of the outages and have developed a plan to prevent and mitigate future outages. The report was posted on the CBSA website on
  • CBSA/SSC Plan includes:
    • quality controls related to key IT changes
    • collaboration between CBSA, SSC and air industry and trade chain partners in planning IT changes
    • communications with industry partners
    • awareness of real world business impacts resulting from an outage of CBSA systems
    • integration of IT change and incident management among government and industry partners
    • revised outage protocols and business continuity plans to better prepare for digital disruption Progress to-date on the communication front includes strengthening the quality of existing messages to industry partners and expanding live communications to ensure operational effectiveness during incidents
    • SSC and the CBSA have integrated IT change and incident management processes and are continuing to collaboratively work together to execute the action plan
  • On , the Honourable Gary Anandasangaree, Minister of Public Safety, joined by Canada Border Services Agency (CBSA) President, Erin O'Gorman, and Shared Services Canada (SSC) President, Scott Jones, hosted a virtual roundtable with industry partners to discuss recent CBSA information technology (IT) system outages
    • During the meeting, Minister Anandasangaree and our President expressed their personal commitment in working with partners to find solutions to disruptive system outages
    • During the open forum, partners voiced strong engagement and a willingness to continue working jointly with the Agency and SSC to address issues

10 point plan (System outage)

  1. Complete root cause analyses of all three incidents and apply recommendations and lessons learned
    • SSC and the CBSA have completed a joint investigation
  2. Establish joint IT change management committee with CBSA, SSC and air industry partners
    • Launch weekly change planning meetings with industry partners, starting the week of Oct. 20 with all airport authority CIO teams. Expand subsequently to domestic airlines, and then establish same with trade chain partners
    • Publish weekly forward schedule of changes to our industry partners
    • Strengthen existing CIO-level engagement with air industry partners
    • Establish CIO-level engagement with commercial and trade partners
  3. Improve CBSA and SSC change and incident management
    • Integrate incident change and management processes between the CBSA and SSC (immediately)
    • Establish CIO approval of all changes impacting the CBSA (immediately) and inform CBSA President and Shared Services Canada Deputy Head in advance of all changes
    • Ensure that all CBSA services, systems and applications, and their infrastructure dependencies are well-documented and understood (including certificate expiry dates)
  4. Conduct joint audit of IT Change Management and Incident Management by CBSA and SSC Chief Audit Executives, to evaluate effectiveness and make recommendations for improvement
  5. Improve industry partner communications and engagement channels and protocols
    • Document and enhance all industry partner communication processes and protocols regarding IT changes and incidents within the CBSA and between the CBSA and its industry partners
    • Review and strengthen the quality of messages to industry partners
    • Review and adjust active (live) communications tools such as MS Teams to ensure operational effectiveness during incidents
  6. Review and bolster the CBSA's IT systems and IT infrastructure hosted by SSC
    • SSC with CBSA to review the IT infrastructure that supports the CBSA's systems and applications and develop a plan to strengthen it, improve resiliency to changes and incidents
    • SSC and CBSA to improve automated monitoring of key systems and alerting of issues
    • CBSA and SSC to thoroughly review the CBSA's IT systems and applications that underpin key services and inter-operations with industry partners to determine ways to improve resiliency to changes and incidents
  7. Adjust the Agency's Investment Plan to prioritise technical debt reduction
    • Ensure that areas of aging systems and technologies are clearly identified for renewal in the CBSA's IT Investment Plan
  8. Adjust the Agency's crisis/emergency management plan and procedures based on recent events
    • Review CBSA and IT branch crisis management plans and procedures to ensure that experiences and lessons from these incidents are incorporated
    • Conduct table-top exercises to test the Agency's readiness for future major IT outages
  9. Improve the Agency's outage protocols and business continuity plans to better prepare for digital disruption
    • Review Travellers program outage protocols to:
      • Reinforce best practices for CBSA operations and airports to manage during PIK outages and ensure consistency across regions, airlines to manage during Interactive Advance Passenger Information/Passenger Protect Program outages
      • Revisit and update outage protocols procedures to continue traveller processing during IT outages
      • Revisit and update airport/airline procedures for to ensure alignment with CBSA processes/requirements
      • Ensure that all BCP documentation is up-to-date and available
    • Review Commercial program outage protocols and business continuity plans to incorporate best practices and innovations found during these incidents and harmonise across regions
    • Review intelligence business continuity plans and adjust for any gaps found related to IT system outages, if required
  10. Review federal government stakeholder communication protocols to increase broad awareness
    • Building on recent updates to the communication protocols, examine means of engaging and updating GC partners regarding significant CBSA incidents, outages and events, and revise or strengthen where required

10 point plan – Joint progress report

1. Complete root cause analyses of all three incidents and apply recommendations and lessons learned

Action 1.1:
SSC and the CBSA have a joint investigation currently underway, which will be completed by Oct. 31.
Date:
Lead:
SSC/CBSA
Current status:
Completed
Comment:
Joint report completed and submitted.

2. Establish joint IT change management with CBSA, SSC and air industry partners

Action 2.1:
Launch weekly change planning meetings with industry partners, starting the week of Oct. 20 with all airport authority CIO teams. Expand subsequently to domestic airlines, and then establish same with trade chain partners.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Weekly engagement series set-up, one with Airport Authorities (AAs) and the other with domestic airline companies.

Action 2.2:
Publish weekly forward schedule of changes to our industry partners.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Forward schedule (FSC) is shared with established engagements stated in the above. A specific template was created in January 2026 and ISTB is completing a Weekly Forward Schedule of Change and shares with industry partners.

Action 2.3:
Strengthen existing CIO-level engagement with air industry partners.
Date:
Lead:
CBSA
Current status:
Completed
Comments
CIO counterparts identified, communication channels established, and regular engagements scheduled. CIO meeting with AAs on January 22, and airlines on January 21.

Action 2.4:
Establish CIO-level engagement with commercial and trade partners.
Date:
Lead:
CBSA
Current status:
In progress
Comment:
ISTB and CTB currently formalizing engagement approach within the BCCC consultative forum. Initial participant have been identified, invitations are being issued and the first meeting with trade partner representatives is anticipated for April.

3. Improve CBSA and SSC IT change and incident management

Action 3.1:
Integrate IT change and incident management processes between the CBSA and SSC.
Date:
Lead:
SSC/CBSA
Current status:
Completed
Comment:

Short term: Integrated RCW Change Approval process in place.

As of , a new integrated change management review and approval process based on risk and impact assessment was implemented.

Integrated Incident Management process in place, CBSA HART team has a direct line to IM coordinators at SSC.

Implemented interim incident coordination measures for CBSA High and Critical priority incidents and acceptance of CBSA priority classification without re-scoring.

CBSA included as an impacted partner on GCMS Critical incidents to ensure direct visibility.

Change Management Process includes daily review of changes with CBSA (Director and DG) including timing and potential system collisions, to then submit to CIO/ADM for final review and approval.

Long term: CRA-led CBSA-CRA-SSC working group to review an integrated approach to Incident Management launched.


Action 3.1.1:
SSC to onboard SSC service lines supporting CBSA to Enterprise ITSM System tool (ONYX)
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:

The impact assessment concluded that accelerated onboarding is not feasible; onboarding to ONYX will proceed as planned in July. This initiative is being managed as a project. Restricted change window for FIFA games from June 11 to July 8 has impacted the planned release date.

This onboarding must align with the CRA Fusion release, with a requirement for a bidirectional interface (BDI) that provides the necessary details to support effective incident and change management processes. Trilateral Working Group with CRA/SSC/CBSA was established to optimize tool transitions that enable Incident Management and Change Management workflows that impact all three organizations. BDI Demo was held and additional requirements were provided to SSC as required prior to onboarding service lines. CBSA/SSC/CRA preparing recommendations and will be sharing with senior management the week of March 30.


Action 3.2:
Establish CIO approval of all changes impacting the CBSA and inform CBSA President and Shared Services Canada Deputy Head in advance of all changes.
Date:
Lead:
SSC/CBSA
Current status:
Completed
Comment:
Integrated Change Approval Process identified above includes CIO-level approval from CIO/SADM and DMs are informed.

Action *3.3:
Ensure that all CBSA critical business applications and services, and their IT infrastructure dependencies are accurately documented and well-understood (including certificate expiry dates).
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:

Application mapping has been organized into 5 steps to develop a repeatable process.

Step 1 will establish foundational application-to-server mappings, to provide a minimum viable relationship model that enables future dependency analysis. This activity is complete for all CBAS applications. CBSA is now mapping remaining applications identified in the Application Portfolio Management (APM).

Step 2-4: Automatic Infrastructure Discovery (TADDM) is underway and an initial technical blueprint of SSC-managed infrastructure supporting CBSA applications has been completed with some gaps. Investigation and review is underway.

Step 5: Integration into the Configuration management database (CMDB, project PRJ-009537) that when aligned with validated application mappings (Step 1), this data will support impact analysis, change assessment, and incident response by answering "what is affected if this component fails."

Certificate Change and Management Runbook (SOP) has been drafted. The inventory development and the supporting process has been drafted as well. SSC is assessing the feasibility of including certificate dependency in CMDB.

Assessing current state of upward traceability from applications to programs and services and linking to these mapping efforts.


Action 3.4;
Conduct a joint SSC - CBSA review to identify and implement improvements to the oversight, requisite training and experience for employees in key IT change management roles.
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:
Review is complete and implementation of the identified improvements is underway in both departments.

Action 3.5:
Enhance SSC personnel awareness of CBSA operations, with a view to initiating cultural change that will improve personal and collective accountability. This will improve scrutiny, review, collaboration and communication to avoid similar human error in the future.

Action 3.5.1:
Deliver a plan to initiate cultural change.
Date:
Lead:
SSC
Current status:
In progress
Comment:

Initial plan developed for review that includes items for understanding behavior and culture as well as embedding accountability. Two networking service lines will be used to test the methodology.

Culture‑shift campaign concept developed, anchored in the principle: "No incidents caused by us."
Model draws inspiration from the private sector company Alcoa. This approach shifts the focus from speed to the safety and quality of change, creates a shared cross‑service language, reinforces accountability and disciplined behaviors, and aligns tools, QA, training, and messaging around a common standard.


Action 3.5.2:
Implement the plan for cultural change.
Date:
Lead:
SSC
Current status:
Not started

4. Conduct joint audit of IT Change Management and Incident Management by CBSA and SSC Chief Audit Executives, to evaluate effectiveness and make recommendations for improvement

Action **4.1:
Chapter 1: IT Change Management
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:
The final Audit Engagement Plan has been signed by both organizations and the joint team is in the examination phase of the audit. Integrated audit report is on track to deliver in April. Reporting to Audit Committee is expected in June.

Action 4.2:
Chapter 2: IT Incident Management
Date:
Lead:
SSC/CBSA
Current status:
Not started
Comment:

CBSA/SSC: Given the complexity of the engagement and the timelines involved, the expectation will be to launch the Incident Management audit once the work related to 4.1 is substantially completed. To ensure continuity and efficiency, the same team that is conducting item 4.1 will be used for this project.

5. Improve communications and engagement channels and protocols, internally and with industry partners

CBSA/SSC Investigative Report was published on external CBSA website December 19th. Progress Report updates will be embedded into the Joint Report posted on the CBSA website, and updates to the website will be done monthly to track completion dates; currently at the ISTB VP approval stage.


Action 5.1:
Document and enhance all industry partner communication processes and protocols regarding IT changes and incidents within the CBSA and between the CBSA and its industry partners.

Action 5.1.1:
Airport Authorities
Date:
Lead:
CBSA
Current status:
Completed
Comment:
CBSA Escalation and Communication Framework for IT incidents has been updated and a new Standard Operating Procedure has been developed for communication with AAs and within the CBSA for IT changes.

Action 5.1.2:
Airlines
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Enhancements have been made to processes and protocols, new documentation is underway. Documentation for incident management completed, protocol for change management has been drafted. The aim is to receive approvals the week of March 9.

Action 5.1.3:
Trade Chain Partners
Date:
Lead:
CBSA
Current status:
In progress
Comment:
Enhancements have been made to processes and protocols. Documentation for incident management completed, protocol for IT change management is being drafted, on pace to complete by the end of March.

Action 5.2:
Review and strengthen the quality of messages to industry partners.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Feedback received from TCPs on timing and level of detail received in current communication. Templates have been revised and put in to use as of December 10.

Action 5.3:
Review and adjust industry partner active (live) communications tools to ensure operational effectiveness during incidents.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
The CBSA has reviewed their industry partner active (live) communications tools and have adjusted to include an MS Teams channel for Airport Authorities (AAs) and another one for domestic airlines (including Airline Council). The implementation of this adjustment is complete for AAs, and the final step for domestic airlines is the approval of the Interim Authority to Operate.

Action 5.4:
Review and adjust internal CBSA communications protocols regarding IT changes and incidents.
Date:
Lead:
CBSA
Current status:
Completed
Comment:

CBSA Escalation and Communication Framework for IT incidents has been updated to reflect adjustments made in the internal communication protocols. Other Standard Operating Procedures from the Border Operations Centre, Corporate Communications and Digital Facilitation and Support services in IT Operations that relate to communications in terms of incidents and changes have been adjusted.
TB is drafting a comprehensive CONOPS that will explore future enhancements to internal CBSA communications in the event of incidents ().

6. Review and bolster the CBSA's IT systems and IT infrastructure hosted by SSC

Action 6.1:
SSC with CBSA to review the IT infrastructure that supports the CBSA's systems and applications and develop a plan to strengthen it, improve resiliency to changes and incidents.
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:
The CBSA has identified the key IT systems and applications critical to the delivery of services and inter-operations with industry partners that are vulnerable to outages and for which those outages are disruptive to safe, effective and efficient management of the border. Next step is to identify the end to end business flows that are automated by those systems and the related IT infrastructure dependencies to ensure that improvements are meaningful, measurable, and sustainable. A joint final report of ways to improve resilience will be delivered that covers 6.1 and 6.3. A working group is being established for both items.

Action 6.2:
SSC and CBSA to improve automated monitoring of key systems and alerting of issues.
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:

The key systems identified for this action item are PIK, PPP, IAPI, and ICES. The work to achieve improvements has been broken down in two activities:

Phase 1:

  • CBSA initiated a comprehensive review (76% completed) of all application alerts that currently result in a notification that is passive (email or other messaging service) or resultant (by way of an on-call page). The goal is to better understand the alert landscape, eliminate unnecessary alerts, reduce alert fatigue, and improve overall incident response effectiveness.
  • Through working groups, CBSA/SSC jointly explored additional automation to improve monitoring and alerting with PIK and ICES as initial use cases. PIK exploration complete, ICES has moved to phase 2.
  • Preliminary analysis shows that SSC has coverage at an infrastructure level for all CBSA systems.
  • Complete for SSC.

Phase 2

  • CBSA has started the analysis of the responses received in Phase 1 for the key systems identified and started documenting proposals to improve alerting of issues. Currently implementing adjustments to existing PIK alerts for software and infrastructure to make them all resultant to fine tune thresholds. Next will be PPP and IAPI.
  • CBSA is also exploring other monitoring options for PIK, based on a gap analysis.
  • Within the ICES WG, work is underway to explore the art of the possible for observability. The architecture remains incomplete and no diagram is yet available. CBSA is comfortable with their existing APM monitoring, while SSC is advancing efforts to establish full stack monitoring.

An alternative strategy is being examined as well: introducing a Role Based Access Control (RBAC) model.


Action 6.3:
CBSA and SSC to thoroughly review the CBSA's IT systems and applications that underpin key services and inter-operations with industry partners to determine ways to improve resiliency to changes and incidents.
Date:
Lead:
SSC/CBSA
Current status:
In progress
Comment:

The CBSA has identified the key IT systems and applications critical to the delivery of services and inter-operations with industry partners that are vulnerable to outages and for which those outages are disruptive to safe, effective and efficient management of the border. Next step is to identify the end to end business flows that are automated by those systems and the related IT infrastructure dependencies to ensure that improvements are meaningful, measurable, and sustainable. A joint final report of ways to improve resilience will be delivered that covers 6.1 and 6.3. A working group is being established for both items.

7. Focus Government of Canada attention and priority on CBSA technical debt reduction

Action 7.1:
Ensure that areas of aging systems and technologies are clearly identified for renewal in the IT Investment Plans of both SSC and the CBSA.

Action 7.1.1:
CBSA
Date:
Lead:
CBSA
Current status:
Completed
Comment:
The CBSA IT investment plan was updated with available data gathered as part of the Agency investment planning efforts. A preliminary list has been shared with SSC to align their planning efforts. Continuous updates will be made following the quarterly review cycle prescribed by the TBS Integrated IT Planning Cycle/Departmental Plan on Service and Digital.

Action 7.1.2:
SSC
Date:
Lead:
SSC
Current status:
In progress
Comment:
SSC has provided a list of aging infrastructure to CBSA for review.

Action 7.2:
Engage central agencies to better-describe and prioritize Government of Canada critical services, to inform decisions on investment, workload management, resource allocation and operations.
Date:
Lead:
CBSA
Current status:
In progress
Comment:
A state of affairs has been prepared on the central role of IT in border management and the need to invest further in CBSA's Digital Border and address technical debt. Focus will now shift to engaging central agencies and prepare for a Fall 2026 budget submission.

8. Adjust the Agency's emergency management plan and procedures based on recent events

Action 8.1:
Review CBSA and IT branch emergency management plans and procedures to ensure that experiences and lessons from these incidents are incorporated.
Date:
Lead:
CBSA
Current status:
Completed
Comment:

Strategic Emergency Management Plan (SEMP) has been updated to include lessons learned from these outages; DG review held January 27. Tabling at EC for endorsement; postponed until further notice. Completed; not required to wait for governance.

IT procedures under review in parallel with other actions (3, 5, 9).


Action 8.2:
Conduct table-top exercises to test the Agency's readiness for future major IT outages
Date:
Lead:
CBSA
Current status:
In progress
Comment:

Table-top exercise (TTX) to review existing communication processes for unplanned outages completed on December 4and action items have been identified to improve.

A second TTX has been prepared to test the Security and Emergency Management Plan and Cyber Security Event Management Plan. Ready to execute, just awaiting exercise date.

9. Improve the Agency's outage protocols and business continuity plans to better prepare for digital disruption

Agency-wide review of business continuity plans was launched. Over 535 BCPs to be updated throughout the Agency. The Agency's Business Continuity Management Program is supporting this renewal with a series of detailed guidance sessions for those critical service owners to assist in the completion/update of their BCPs. On track to be completed by March 31, 2026.

Action 9.1:
Review Travellers program outage protocols to

Action 9.1.1:
Reinforce best practices for CBSA operations and airports to manage during PIK outages, and ensure consistency across the regions.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Best practices were re-distributed to the Regions, and subsequently reviewed and discussed through FMM governance. The practices were shared with Airports and will be further discussed with them in February 2026.

Action 9.1.2:
Reinforce best practices for CBSA operations and airlines to manage during Interactive Advance Passenger Information/Passenger Protect Program outages, and ensure consistency across regions.
Date:
Lead:
CBSA
Current status:
Completed
Comment:

IAPI: TB has assessed the current processes and has revalidated SOPs for air carriers.

PPP: As an interim measure, TB has assessed the current processes and has revalidated SOPs for air carriers. At the same time, TB is working with Transport Canada and Public Safety to develop additional mitigation measures.


Action 9.1.3:
Revisit and update outage protocols to continue traveller processing during IT outages.
Date:
Lead:
CBSA
Current status:
Completed
Comment:

TB distributed on , to frontline operations a quick reference guide that supports frontline officers during outages, ensuring continued traveller processing.

TB is drafting a comprehensive CONOPS that will explore future enhancements to internal CBSA communications in the event of incidents ().


Action 9.1.4:
Revisit and update airport/airline procedures to ensure alignment with CBSA processes/requirements.
Date:
Lead:
CBSA
Current status:
Completed
Comment:
Finalized review of the airport/airline procedures and they are aligned with CBSA processes and requirements. TB will continue to monitor any changes or updates to processes and update these procedures where and when needed.

Action 9.1.5:
Ensure that related business continuity plans are revised to incorporate best practices and innovations found during these incidents and harmonized across regions.
Date:
Lead:
CBSA
Current status:
In progress
Comment:
Agency-wide review of business continuity plans has now launched; the exercise is scheduled to be completed by . An estimated 9 BCPs to be updated for TB.

Action 9.2:
Review Commercial program outage protocols and related business continuity plans to incorporate best practices and innovations found during these incidents and harmonise across regions.
Date:
Lead:
CBSA
Current status:
In progress
Comment:

Commercial procedures under review with internal and OGD partners.

Best practices identified during the outage along with feedback from Government of Canada partners and industry stakeholders have been incorporated into guidance for staff and draft revisions to the System Outages Contingency Plan (SOCP). BCCC System Outage Working Group held its second meeting on March 2 and discussed the Agency's efforts to address operational consistency during an outage. The Agency also shared a draft update to the SOCP and invited feedback by March 11. The next iteration of the draft SOCP was sent with a deadline to respond by March 25. The 3rd meeting is scheduled March 30.

Agency-wide review of business continuity plans has now launched; the exercise is scheduled to be completed by March 31, 2026. An estimated 6 BCPs to be updated for CTB.


Action 9.3:
Review intelligence business outage protocols and continuity plans and adjust for any gaps found related to IT system outages, if required.
Date:
Lead:
CBSA
Current status:
In progress
Comment:
Agency-wide review of business continuity plans has now launched; the exercise is scheduled to be completed by .

10. Review federal government stakeholder communication protocols to increase broad awareness

Action 10.1:
Building on recent updates to the communication protocols, examine means of engaging and updating GC partners regarding significant CBSA incidents, outages and events, and revise or strengthen where required.
Date:
Lead:
CBSA
Current status:
Completed
Comment:

Corporate communications has developed an SOP to document the protocol to advise existing and newly identified GC partners in terms of corporate and public communication.

CTB has engaged with the Federal Border Partners Initiative to examines means of updating GC partners regarding incidents and outages that may impact programs and services that the CBSA administers on their behalf.

Annexe A

*3.3 This will be achieved with information from the latest Application Portfolio Management (APM) review exercise and the Business Impact Analysis (BIA) exercise as part of the Business Continuity Management Program. Both of these exercises were completed with business owners so their input will drive the technical mapping. Early indication is this will require more time but priority will be given to critical business applications that support PIK, IAPI, PPP, and ACROSS.

The scope of this sub-item will encompass the CBSA Critical Business Applications and Services (CBAS) that enable CBSA critical services, and which are operationally supported by the SSC. More specifically, business applications owned by the CBSA, business applications owned by 3rd parties that support CBSA critical services and the SSC infrastructure services that CBAS depend on to deliver a critical service.

For this sub-item, IT infrastructure dependencies will be mapped in alignment with the Application to Server Mapping Initiative launched by SSC for a sub-set of partner departments. This first-level mapping will be defined as the infrastructure CIs including the network and transport layers, including Windows, Linux and mainframe. The first-level of mapping will encompass:

  • Application to server
  • Application to application dependencies

For this sub-item, certificate management improvement will be achieved with the development of an integrated list of certificates that CBSA has visibility on and processes to maintain the data and integrate as part of broader change management practices.

**4.1 Developed through collaboration between the CBSA and SSC teams:

Audit Objective:
The audit's objective is to provide assurance that the CBSA and SSC have governance, coordination mechanisms, and key control activities in place to manage changes to IT systems supporting CBSA operations.

Audit Scope:
The period under review will span to . The scope of work will include an examination of IT change management governance, communications and collaboration mechanisms, and key control activities affecting CBSA systems and services.

Scope exclusions

  • IT change management activities performed within CBSA that do not relate to SSC's activities
  • IT change management activities performed by SSC that do not relate to CBSA's activities
  • Assessments of operational processes related to IT change management, such as, IT project management, IT asset management, configuration management, business continuity management, access management, data and information management, and IT security
  • A root-cause analysis of the incidents from

Page details

Date modified: